9
Check list
Positioning
□
Surface adjustment
□
Drainage
Pipe installation, hot and cold side
□
Pipe connections in accordance with the diagram
□
Flexible hoses
□
Expansion and bleed tank
□
Strainer, hot and cold side
□
Pipe insulation
□
Open radiator valves
□
Leak test, hot and cold side
Electrical Installation
□
Circuit-breaker
□
Fuse
□
Positioning of the outdoor sensor
Commissioning
□
Bleeding, hot and cold side
□
Settings control system
□
Manual test components
□
Manual test different operating conditions
□
Noise check
□
Function test safety valve
□
Function test mixer valve
□
Trimming the heating system
Customer information
□
Contents of this manual
30 – User manual VUGFB102