Refrigerants

Applicable to HCFC, HFC, R717 (Ammonia),

R744 (CO

2

), Propane, Butane, Iso-Butane and 

Ethane.

The valve is only recommended for use in 

closed circuits. For further information please 

contact Danfoss.

Temperature range

–60/+150°C (–76/+302°F)

Pressure range

52 bar (752 psi)

Please see the technical brochure 

(DKRCI.PD.F00.A) for a more detailed 

description of the  pressure and temperature 

range.

The valve must be installed with the spindle 

on top vertically upwards or in horizontal 

position (fig. 1). SCA-X valves should be 

opened by hand without the use of tools 

or other devices. The valve is designed to 

withstand a high internal pressure. However, 

the piping system should be designed 

to avoid liquid traps and reduce the risk 

of hydraulic pressure caused by thermal 

expansion. It must be ensured that the valve 

is protected from pressure transients like 

“liquid hammer” in the system.

Flow direction

Direct the flow towards the cone as indicated 

by an arrow on the valve housing (fig. 1).

Welding

The bonnet should be removed before 

welding (fig. 2) to prevent damage to the 

O-rings in the packing gland and the gasket 

between the valve body and bonnet, as 

well as the teflon gasket in the valve seat. 

Be careful not to damage the teflon cone 

ring and make sure the complete bonnet is 

protected from dirt and water while removed.

Only materials and welding methods, 

compatible with the valve housing material, 

must be applied to the valve housing. The 

valve housing must be free from stresses 

(external loads) after installation.

The valve should be cleaned internally to 

remove welding debris on completion of 

welding and before the valve is reassembled. 

Avoid welding debris and dirt in the threads 

of the housing and the bonnet. 

Do NOT remove or service the dark colored 

grease between the spindle thread and 

the bonnet. In case the grease has been 

contaminated with dirt, debris, particles 

or water the complete top part must be 

replaced.

Stop check valves must not be mounted in 

systems where the outlet side of the valve 

is open to atmosphere. The outlet side of 

the valve must always be connected to the 

system or properly capped off, for example 

with a welded-on end plate.

Assembly

Remove welding debris and any dirt from 

pipes and valve body before assembly. Check 

that the cone has been fully screwed back 

towards the bonnet before it is repositioned 

in the valve body (SCA DN 50-125) (fig. 3).

Important for the SCA-X valves:

Full capacity is only obtained when the 

spindle is screwed outward, “into bonnet”, i.e. 

counterclockwise (fig. 3).

Tightening

Tighten the bonnet with a torque wrench, to 

the values indicated in the table (fig. 3).

Please note that the table (fig. 3) containing 

maximum torque must be adhered to and 

never exceeded

.

Important for SCA-X/CHV-X 50 - 125 valves:

For optimal flow the insert must be installed 

as indicated in (fig. 10). Otherwise kv value 

will be below indicated in the 

technical brochure.

Colours and identification

The SCA-X and CHV-X valves are painted 

with a red primer in the factory. Precise 

identification of the valve is made via the 

green coloured ID ring at the top of the 

bonnet, as well as by the stamping on the 

valve body. The external surface of the valve 

housing must be protected against corrosion 

with a suitable protective coating after 

installation and assembly.

Protection of the name plate when repainting 

the valve is recommended.

Maintenance

Packing gland (only SCA-X types)

When performing service and maintenance, 

replace the complete packing gland only, 

which is available as a spare part. As a 

general rule, the packing gland must not be 

removed if there is internal pressure in the 

valve. However, if the following precautionary 

measures are taken, the packing gland can be 

removed with the valve still under pressure:

Backseating (fig. 4)

To backseat the valve, turn the spindle 

counterclockwise until the valve is fully open.

Pressure equalization (fig. 5)

In some cases, pressure forms behind the 

packing gland. Hence, a handwheel or a large 

washer (pos. A) should be fastened on top of 

the spindle while the pressure is equalized. 

The pressure can be equalized by slowly 

screwing out the gland.

Removal of packing gland (fig. 6)

Packing gland can now be removed.

Dismantling the valve (fig. 8)

Do not remove the bonnet while the valve is 

still under pressure.

DN 15-40 (fig. 8a):

-  Check that the gasket (pos. A+B) has not 

been damaged. 

-  If the gasket (pos. A) has been exposed  

to air or other refrigerants than listed in 

this installation guide for more than 

  6 months it must be replaced.

-  Check that the spindle is free of scratches 

and impact marks.

-  If the teflon cone ring has been damaged, 

the whole cone assembly must be 

replaced.

DN 50-125 (fig. 8b):

-  Check that the spring (pos. A) is intact.

-  Check that the gasket (pos. B+E) has not 

been damaged.

-  If the gasket (pos. A) has been exposed  

to air or other refrigerants than listed in 

this installation guide for more than 

  6 months it must be replaced.

-  Check that the spindle (pos. C) is free of 

scratches and impact marks.

-  If the teflon cone ring (pos. D) has been 

damaged, the whole cone assembly must 

be replaced.

Replacement of the cone (fig. 9)

DN 15-40:

O-ring (pos. C) prevents the cone from falling 

out. Pull the cone clear of the bonnet. Ensure 

that the spring is not lost in the process. 

Remove dirt, if any. Mount O-ring (pos. C) on 

cone. Mount spring and cone in bonnet. 

Do NOT remove or service the dark colored 

grease between the spindle thread and 

the bonnet. In case the grease has been 

contaminated with dirt, debris, particles 

or water the complete top part must be 

replaced.

Assembly

Remove dirt, if any, from pipes and housing 

before assembly. Important for the SCA-X 

valves: Full capacity is only obtained when 

the spindle is screwed outward, “into the 

bonnet”, i.e. counterclockwise (fig. 3). 

Note: 

For SCA-X and CHV-X sizes DN 15-40 it 

is important to ensure that the lower 

and upper part of the insert is tightly 

screwed together (fig. 11) and that this 

screw connection is kept tight during 

repositioning of the cone in the housing.

Use a torque wrench to tighten the bonnet 

(fig. 3).

Tightening

Tighten the bonnet with a torque wrench, 

to the values indicated in the table (fig. 3). 

Tighten the packing gland with a torque 

wrench, to the values indicated in the table 

(fig. 7).

Use only original Danfoss parts, (including 

packing glands and gaskets) for replacement. 

Materials of new parts are certified for the 

relevant refrigerant. 

In cases of doubt, please contact your local 

Danfoss sales office. 

Summary of Contents for CHV-X 15-125

Page 1: ... PI FL1 S6 ML 520H8310 1 Danfoss M148G0010_1 Nm LB feet DN 15 20 21 15 DN 25 32 40 50 44 32 Nm Lb feet DN 65 74 54 DN 80 44 32 DN 100 75 53 DN 125 183 135 Nm LB feet DN 15 20 50 37 DN 25 40 75 55 DN 50 65 95 70 DN 80 100 150 111 DN 125 250 184 Only allowed for valve sizes 15 40 Permitido somente para tamanhos de válvula 15 40 1a 1b 2 3 3a 4 4a ...

Page 2: ...20H8310 2 E B C Danfoss M148G0012_1 Nm LB feet DN 15 20 50 37 DN 25 32 40 75 55 DN 15 40 DN 50 125 DN 15 40 B B Danfoss M148G0011_1 A Danfoss M148G0018_1 Ensure tight screw connection Assurez vous que les vis sont bien serrées 5 6 7 8a 8b 9 10 11 ...

Page 3: ...e de vanne DN Closing and opening pressure ΔP max P1 P2 Pression de fermeture et d ouverture ΔP max P1 P2 Closing pressure ΔP max P2 P1 Pression de fermeture ΔP max P2 P1 Opening pressure ΔP max P2 P1 Pression d ouverture ΔP max P2 P1 100 44 bar 638 psi 52 bar 754 psi 44 bar 638 psi 125 33 bar 478 psi 52 bar 754 psi 33 bar 478 psi ...

Page 4: ...ring at the top of the bonnet as well as by the stamping on the valve body The external surface of the valve housing must be protected against corrosion with a suitable protective coating after installation and assembly Protection of the name plate when repainting the valve is recommended Maintenance Packing gland only SCA X types When performing service and maintenance replace the complete packin...

Page 5: ...un estampillage sur le corps de la vanne La surface extérieure du corps de la vanne doit être protégée de la corrosion à l aide d un revêtement adéquat appliqué après l installation et le montage Il est recommandé de protéger la plaque signalétique lors de l application de la peinture sur la vanne Maintenance Presse étoupe uniquement pour les types SCA X Lors des opérations de service et de mainte...

Page 6: ... Danfoss DCS MWA 2018 05 DKRCI PI FL1 S6 ML 520H8310 6 ...

Page 7: ... Danfoss DCS MWA 2018 05 DKRCI PI FL1 S6 ML 520H8310 7 ...

Page 8: ... Danfoss DCS MWA 2018 05 DKRCI PI FL1 S6 ML 520H8310 8 ...

Reviews: