background image

  DKRCCPICD0A122 

3

Wiring Option A: 

Cut-Out on temperature fall

Wiring Option B: 

Cut-Out on temperature rise

LOAD

 

LINE

 

LINE

LOAD

Wire dimensions: 10 AWG max.
Cable entry: 7/8” cable entry for ½” male pipe thread connection 
(conduit boss) or similar (Pg13.5 or Pg16) screwed cable entry.

Contact function test (Manual trip)

When the electrical leads are connected the contact function can 
be manually tested regardless of temperature conditions in the 
system. 
The manual trip lever is located in the left side of the KPU. It must 
be operated with fi ngers only. Do not use screwdriver as it will 
damage the control.

Manual trip. 
Push the lever.
Use fi ngers only !

manual reset button (only 
on versions sold with 
manual reset function)

grounding screw

terminal block

Determination of diff erential

For KPU controls with vapor charge and automatic reset, use the 
following graphs to determine the correct diff erential.

NOTE

While operating the manual trip on KPU controls with 
manual reset it is necessary to push the reset knob.

Example:
HSP = +45

°

F  

 

DIFF (from graph):

LSP = +32

°

F => 

13

°

F (value which has to be set on 

  

diff . scale)

LSP

HSP

LSP

HSP

HSP

LSP

Reviews: