3
After the whole frames are set up, they should be the same as the pictures below.
Page 1: ...6m PVC Series Storage tent PRO Manual 07 08 2013...
Page 2: ...he marquee tent is covered by your home contents insurance Marquees tents must be evacuated under extreme weather conditions In the event of snow always remove snow from the roof of the marquee tent r...
Page 3: ...6 6 Extension pipe 4 4 4 7 Corner arch 12 22 32 8 Center arch 6 11 16 9 Connecting pipe 44 99 154 10 Connecting pipe 11 11 11 11 Extension pipe 8 18 28 12 Door Pillar 4 4 4 13 Door pillar 4 4 4 14 Cro...
Page 4: ...clip 20 40 60 32 Rope 4 4 4 33 Rope 2 2 2 Attention Please use gloves when assembling the metal frame portion of this unit The metal components of this products have been treated with a rust preventi...
Page 5: ...3 After the whole frames are set up they should be the same as the pictures below...
Page 6: ...the 1 75 22 screw andthe wingnuts 25 Connect the ceiling rail with respective extension pipe 6 using the 2 5 23 screws and wingnuts 25 Step 2 Repeat step 1 for the next 5 10 15 elements to place them...
Page 7: ...o the ground using pegs 8x300mm 20 Step 4 Start setting up one side first Connect the corner arches 7 to the legs 1 and 2 Secure the frame using the connecting pipes 9 and 10 Attach the diagonal pipes...
Page 8: ...ar set like below picture Step 7 Use ropes to attach the door and cover the the frame To nd a proper way and strength to attach the cover to frame carefully Please do not use too much strength to tear...
Page 9: ...om Spain espana dancover com Italy italia dancover com Germany germany dancover com Switzerland schweiz dancover com France france dancover com Austria austria dancover com Sweden sverige dancover com...