background image

 

Congratulations

 

on your purchase of our instant shelter. This unit is a combination 

of excellent manufacturing and design. It is comprised of a rigid frame and a durable 
cover.  For  easy  assembly,  we  have  marked  all  the  parts  with  codes,  with  proper 
installation,  use  and  maintenance,  your  unit  will  provide  many  years  of  good  and 
suitable service.

 

 

 

Tools required 

The following hand tool will be needed for proper Installation of your new building: 
12mm,14mm

and 17mm Open End Wrenches, 

12mm, 14mm, 17mm Sockets or Box Wrench, 
Large Flat Head Screwdriver, 
2lb maul or Sledgehammer 
4 Foot Level 14’ Step Ladder 
Stake &String for aligning Base Plates &Frame 

 
 

Assembly procedure 

1. Prepare location and place all unit boxes near location sight. Perform an inventory 
check before beginning, to be certain all components are available for installation. 
2. Secure base plate flanges to base surface.

  

3. Assemble every group of arch.

 

 

4. Begin frame assembly with front end arch, first interior arch, purlins, etc. 
5. Add to assemble other groups of arches.

 

6. Install main cover over frame.   
7. Install end cover over end panels.

   

 
 
Read all the detailed instructions and notices in the following assembly 
instructions!

  

 
 
 
 
 
 
 
 
 

 

Summary of Contents for ST03850

Page 1: ...21 04 2023 Manual for Arched Storage for Animals 4x6x2 4m...

Page 2: ...cause the tent to collapse In the event of rain there is a risk of rain puddles building up on top of the roof of the tent Heavy rain puddles can cause the roof to collapse It is your responsibility t...

Page 3: ...17mm Sockets or Box Wrench Large Flat Head Screwdriver 2lb maul or Sledgehammer 4 Foot Level 14 Step Ladder Stake String for aligning Base Plates Frame Assembly procedure 1 Prepare location and place...

Page 4: ...ver from the inside with a broom or soft brush to clear cover Main Cover Lacing the poly rope that secures the main cover to the bottom rail of the frame assembly should be checked and adjusted as nee...

Page 5: ...2 6A Upper standing tube at back panel 1 7 Lower standing tube at front panel 2 7A Lower standing tube at back panel 1 8 Side wall rail tube 12 8A Back wall rail tube 4 8A Door Rail 2 8B Rail on the...

Page 6: ...6 7 8A 8B Figure 1 Sketch Size W 4 L 6 H2 4M 12 3A 8A 13 1 1 1 2 2 3 3 3A 3A 3A 4 5 5 5 5 5 5 5A 6A 8A 8B 8 8 8...

Page 7: ...ends and sides of the building to the dimensions shown in Figure 2 The outline of the strings will represent the final location of the base flanges The initial location of each Corner Base Flanges 5...

Page 8: ...Assemble the front panel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts comple...

Page 9: ...right corner base flange insert a hexagonal bolt and nut to prevent it from popping out of the socket while assembly continues Next stand first interior arch up to repeat insertion into Base flanges I...

Page 10: ...top of frame assembly without being snagged or stressed on any frame members Use multiple ropes over top of frame Having another person inside frame on a ladder to assist in getting Roof Cover over f...

Page 11: ...Figure 10 Installation of the Back Cover...

Page 12: ...ation please visit www dancovershop com Contact information Austria Belgium Croatia Denmark Estonia Finland France Germany Ireland Italy Latvia Lithuania Nederland Norway Poland Portugal Spain Sweden...

Reviews: