background image

W
h

en

 r

ea

d

y

 to

 in

st

al

l R

o

o

f C

o

v

er

, u

n

p

ac

k

 c

o

v

er

 a

n

d

 la

y

 p

ar

al

le

l t

o

 b

u

ild

in

g

 f

ra

m

o

n

 one

si

d

e.

 C

o

v

er

 m

u

st

 b

p

u

lle

d

 o

v

er

 to

p

 o

f f

ra

m

as

se

m

b

ly

 w

ith

o

u

t b

ei

n

g

 s

n

ag

g

ed

 o

r s

tr

es

se

d

 on

an

y

 f

ra

m

m

em

b

er

s. 

U

se

 m

u

lti

p

le

 r

o

p

es

 o

v

er

 to

p

 o

f f

ra

m

e.

 H

av

in

g

 a

n

o

th

er

 p

er

so

n

 i

n

si

de

fr

am

o

n

 a

 la

d

d

er

 to

 a

ss

is

t i

n

 g

et

tin

g

 R

o

o

f C

o

v

er

 o

v

er

 f

ra

m

w

ill

 in

su

re

 th

co

v

er

 w

ill 

go
 on

w

ith

o

u

t a

n

y

 d

am

ag

e.

S

te

p

 #

4

 -

-P

O

S

IT

IO

N

 R

O

O

F

 C

O

V

ER

F

ig

u

re 

9

 F

as

te

n

in

g

 th

R

o

o

f C

over

Summary of Contents for ST03850

Page 1: ...21 04 2023 Manual for Arched Storage for Animals 4x6x2 4m...

Page 2: ...cause the tent to collapse In the event of rain there is a risk of rain puddles building up on top of the roof of the tent Heavy rain puddles can cause the roof to collapse It is your responsibility t...

Page 3: ...17mm Sockets or Box Wrench Large Flat Head Screwdriver 2lb maul or Sledgehammer 4 Foot Level 14 Step Ladder Stake String for aligning Base Plates Frame Assembly procedure 1 Prepare location and place...

Page 4: ...ver from the inside with a broom or soft brush to clear cover Main Cover Lacing the poly rope that secures the main cover to the bottom rail of the frame assembly should be checked and adjusted as nee...

Page 5: ...2 6A Upper standing tube at back panel 1 7 Lower standing tube at front panel 2 7A Lower standing tube at back panel 1 8 Side wall rail tube 12 8A Back wall rail tube 4 8A Door Rail 2 8B Rail on the...

Page 6: ...6 7 8A 8B Figure 1 Sketch Size W 4 L 6 H2 4M 12 3A 8A 13 1 1 1 2 2 3 3 3A 3A 3A 4 5 5 5 5 5 5 5A 6A 8A 8B 8 8 8...

Page 7: ...ends and sides of the building to the dimensions shown in Figure 2 The outline of the strings will represent the final location of the base flanges The initial location of each Corner Base Flanges 5...

Page 8: ...Assemble the front panel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts comple...

Page 9: ...right corner base flange insert a hexagonal bolt and nut to prevent it from popping out of the socket while assembly continues Next stand first interior arch up to repeat insertion into Base flanges I...

Page 10: ...top of frame assembly without being snagged or stressed on any frame members Use multiple ropes over top of frame Having another person inside frame on a ladder to assist in getting Roof Cover over f...

Page 11: ...Figure 10 Installation of the Back Cover...

Page 12: ...ation please visit www dancovershop com Contact information Austria Belgium Croatia Denmark Estonia Finland France Germany Ireland Italy Latvia Lithuania Nederland Norway Poland Portugal Spain Sweden...

Reviews: