Step 7) fi tting the roof cover,
Once you have got the cen-
tre pole assembly fi tting
installed you can start to
secure the roof cover to the
frame, this is done by the
use of the P channel locking
device you will need to slide
the p channel onto the keder
of the roof sheet (fi g 1) then
clip this over the edge of the
eave beam (fi g 2) once you
have done one side install
the p channel to the oppo-
site side. You may fi nd once
you get to side 3 and 4 the
p channels may become
harder to fi t due to the ten-
sion in the roof cover. On
these sides start fi tting the
p channel from the centre
on the eave and work back
to the corners, you may fi nd
this much easier. Once all
side have the P channel fi t-
ted and before you tension
the roof make sure all the
corners are aligned as once
it is tensioned this will not be
possible.