44
Y6
Y6
Y6
Y6
Y6
Y6
Y12
Y
12
Y
12
2
1
L11H
L11A
L12A
Y12
Y6
Y6
L11CX6PCS
L12AX7PCS
Slide all Y6 panels into place. The top of the panels should be pushed up behind
the gutter profile, then pushed in against the base profile as shown in the detail drawings.
The panels should be loosely retained by the glazing bar capping L11A, L11C, L11H and L12A then
tap the bar capping gently into the channels of each frame profile with a rubber mallet.