5
5
- COMPLETE THE ASSEMBLY OF THE STRUCTURE (fig. E).
A
- Mount the roof over the
vertical tubulars
Pos.
05
so as to obtain the complete structure.
B
- After assembly, check the external dimensions with those of the drawing.
It is important that the dimensions correspond to ensure correct assembly of the fabric.
fig. E
195 cm
197 cm