background image

1

Components

Pos. Cod.

Description

Q.ty

01
02
03
04
05
06
07
08
09
10
11
12
13

1685
1686
1696
1695
1697
1576
1758
1797
1689
1787
1688

/
/

3-way joint
4-way joint
Tubular 104 cm
Tubular 95 cm
Tubular 157 cm
2x3 m sheet
Stake
Shading net
Clips
Base
Tip
Dowel ø 8
Screw for dowel ø 8

6
3
6
6
6
1

14

1
8
6
6

12
12

1

- ASSEMBLING THE ROOF STRUCTURE (fig. A).

A

 - Mount the ridges of the 

roof

. To mount the front and

rear ridge use the Pos.

01

 3-way joint while to mount the

central ridges use the Pos.

02

 4-way joint, fit the 104 cm

long tubulars (Pos.

03

) into the slanted slots of the joints

B

 - Connect the ridges to each other using nº 3 

tubulars

95 cm long (Pos.

04

) for each span.

95 cm

104 cm

01

02

fig. A

03

Tubolare

lungo cm 106

04

01

02

Summary of Contents for GH16060

Page 1: ...27 04 2020 for Polytunnel Greenhouse 2x2x2 2m Manual...

Page 2: ...ew for dowel 8 6 3 6 6 6 1 14 1 8 6 6 12 12 1 ASSEMBLING THE ROOF STRUCTURE fig A A Mount the ridges of the roof To mount the front and rear ridge use the Pos 01 3 way joint while to mount the central...

Page 3: ...Contour the joints with sand lime white or other or exert a good pressure on the joints to obtain a mark where to stick the tips Pos 11 Stick the tips with the aid of a tube make sure that the bayonet...

Page 4: ...r means fig C1 to outline the position where to fix the bases Pos 10 then after having traced and drilled the holes fig C2 C6 for the dowels Pos 12 fix the bases in which to subsequently insert the tu...

Page 5: ...4 INSTALL THE VERTICAL TUBES fig D A Insert the tubulars Pos 05 in the bases Pos 10 B Then assemble the frame roof by inserting the joints of the same into the vertical tubulars fig D 05 4...

Page 6: ...roof over the vertical tubulars Pos 05 so as to obtain the complete structure B After assembly check the external dimensions with those of the drawing It is important that the dimensions correspond t...

Page 7: ...6 MOUNTING THE SHEET fig F A Open the sheet zips and then drag the sheet Pos 06 on the structure starting from one side of the greenhouse as shown in the figure 6 fig F 06...

Page 8: ...erted close the zips and arrange the sheet carefully B Use the stakes Pos 07 to fix the sheet on the ground C Cover the protruding part of the sheet with the soil making sure it is well stretched fig...

Page 9: ...pped with a shading net that must be fixed under the roof of the greenhouse with the appropriate plastic clips also supplied A Insert the shading net Pos 08 between the greenhouse sheet and the roof t...

Page 10: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: