.
49
50
Shock hub as described in preload procedure.
Rolling torque can be measured
using a strap and scale as shown or
by using a torque wrench and
adapter bar which spans the
diameter of the hub, attaching to
the planetary bolt holes.
51
52
Install lock plate and align holes as described.
Attach scale and measure rolling torque as
described in preload procedure.
54
Planetary Installation
53
Apply Loctite 262 or equivelant to lock plate
screws. Tighten to 25-28 lbf/ft [34-38 Nm].
Install axle shaft and sun gear.
11
Summary of Contents for 53R-300
Page 1: ...Allied Systems Form 80 790 ...
Page 15: ...61 Install fill drain plug Tighten to 30 35 lbf ft 41 47 Nm 13 ...
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 69: ......
Page 70: ......
Page 75: ......
Page 76: ......