43
44
Lubricate spindle threads with anti-seize.
Apply anti-seize to the spindle nut contact
face and install.
45
Bearing Preload
46
Note:
It is imperative that the
hubs be rotated during the
bearing tightening and pre-loading
process to insure the bearings are
not damaged and accurate
readings are obtained.
Hook a strap onto a wheel stud as shown and
wrap around hub.
47
48
Using a hoist connected to strap rotate the hub
while while running spindle nut down with impact
gun. Do not exceed 1200 lbf/ft [1627 Nm].
Torque, rotate and shock the hub assembly
as described on the Bearing Preload page
69
.
10
Summary of Contents for 53R-300
Page 1: ...Allied Systems Form 80 790 ...
Page 15: ...61 Install fill drain plug Tighten to 30 35 lbf ft 41 47 Nm 13 ...
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 69: ......
Page 70: ......
Page 75: ......
Page 76: ......