10
COMMISSIONING – Workstation 3 Rack-Mount | REV. 0.0.4 | © 2019 Dallmeier
•
Product Documentation
The product documentation for the device consists of various documents
which are provided in printed and/or digital form, as for example via the
website www.dallmeier.com.
Read the complete product documentation for the device carefully and
thoroughly before using the device. Always observe and follow the con-
tained instructions, notes and warnings as well as the technical data in
the currently valid product specification.
Keep all documents in legible condition and in a suitable location for
future reference.
Regularly check the website www.dallmeier.com for the latest product
documentation updates.
•
Condensation
If the device is brought from a cold to a warm environment, resulting
condensation may cause malfunctions and damage. In this case, wait
until the device has reached room temperature (up to 8 hours) before
commissioning.
•
Earthing/Grounding & Equipotential Bonding
For the safety of persons (protection against dangerous contact voltages)
and devices (protection against over-voltages) as well as for the immuni-
ty of information and communication technology equipment to electro-
magnetic interferences (EMI), all protective measures, which are speci-
fied by the currently applicable DIN, VDE and ISO standards and which
provide for a standard-compliant earthing/grounding and a correct
equipotential bonding of electrical and electronic devices, are mandatory
and must be fulfilled by all means.