
14
Mechanical Installation
If the scoreboard is to be suspended from a hoist:
1.
Attach the cable sling to the four lift tubes on the corner braces of the frame.
2.
Lower the hoist cables and attach them to the master links.
3.
Raise the scoreboard 1-2' (305-610 mm) from the floor, and level the scoreboard by
adjusting the turnbuckles built into the slings.
4.
The hoist installer must set upper and lower primary limits and all safety limits.
Daktronics recommends maintaining a minimum of 2' (610 mm) between the
scoreboard and the nearest obstruction.
WARNING! Never raise or lower the scoreboard with personnel or equipment underneath!
Summary of Contents for Tuff Sport BB-2102
Page 2: ......
Page 4: ......
Page 10: ......
Page 26: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 56: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Page 60: ......
Page 62: ...PERIOD GUEST HOME HOME PERIOD GUEST B B B B B B ...
Page 64: ...HOME GUEST PERIOD HOME GUEST PERIOD B B B B B B B B ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 104: ......
Page 108: ......
Page 110: ......