
201 Daktronics Drive, PO Box 5128, Brookings, SD 57006
Phone: 1-800-325-8766 or 605-692-0200 Fax: 605-697-4746
www.daktronics.com E-mail: [email protected]
SCOREBOARD HOIST SUSPENSION SYSTEM SPECIFICATIONS
JOB SPECIFIC SPECIFICATIONS:
• Weight of scoreboard system load
• Vertical lift required
• Hook blocks as required for reeving
• Vertical reach if required
• Quantity and type of elevation detection
• Number of remote pendants
• Pickup points to scoreboard
• Type of mounting
• Hook centers
• Voltage
• Tentative installation start and completion date
• Mounting drawings required from hoist supplier for customer engineers approval
• Hoist weight certification required
• Hoist to include interface steel/fasteners required for mounting to structure
DOCUMENTATION REQUIRED FROM HOIST MANUFACTURER:
• Signed Certification by PE/Company CEO that the design meets the specifications for this application.
• Auxiliary fail-protection secondary braking system to have been installed and functional on at least 2 installations for a period
of one year or be field testable for functionality.
• Recommended inspection schedule.
• Calculations for hoist design must be available on demand with PE signature.
• Certificate of Conformance to metallurgical, drawing and general manufacturing processes of the gear drive manufacturer.
Document must originate from the gear drive manufacturer
• Calculations on maximum impact load to structure if secondary brakes are activated.
HOIST INSTALLATION SCOPE OF WORK:
Provide all labor, materials, and equipment to perform the following
• Accept, lift, and remove hoist from freight carrier. Coordinate all shipments with Daktronics. You are responsible for
coordinating delivery, offloading, and staging and on site transportation of all equipment and materials provided
by your company.
• Provide all necessary labor, equipment and material required for the installation of the hoist system.
• Responsible for providing any/all-rigging steel required for the installation of the hoist system.
• Responsible for removing any grating that may interfere with the hoist system.
• All welds are to be performed by a certified welder. All slag must be chipped and welds must be cleaned.
• All welding rod stubs, slag and other misc. materials must be cleaned up and disposed of properly.
• All steel and welds, shop and field, must be primed, cover coated and finish coated after cleaning.
• Lift and install hoist onto customer provided hoist platform
• Reeve hook blocks and attach to scoreboard hook points.
• Lift and level scoreboard.
• Set all safety limits.
• Verify hoist is fully operational and meets all safety requirements.
• Provide operation/maintenance training to building support staff. Obtain a list of the trainees with their signatures
and submit a copy to Daktronics for file.
• Provide a copy of installation checklist to Daktronics for file.
SL-03610
091212 Page 2 of 2
Summary of Contents for Tuff Sport BB-2102
Page 2: ......
Page 4: ......
Page 10: ......
Page 26: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 56: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Page 60: ......
Page 62: ...PERIOD GUEST HOME HOME PERIOD GUEST B B B B B B ...
Page 64: ...HOME GUEST PERIOD HOME GUEST PERIOD B B B B B B B B ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 104: ......
Page 108: ......
Page 110: ......