background image

Manual # 650381B 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.  Be sure to make the connections correctly between the labeled ribbon 

cables from the main gauge to the lead from each small gauge.

 

5.   Connect the CAT5 cable to the backside 

of the large gauge and take care when 
routing this cable to the control box 
mounting location.  

 

Reviews: