background image

Manual # 650381B 

 

Installation 

1.  First, you will need to make five openings for the system in your desired mounting location.  You 

will need one large hole measuring 5.875” diameter and four smaller holes that are 2.75” 
diameter for the VHX gauges to fit through and sit flush with the surface of the dash. You will also 
need at least 2.5” of depth behind the gauge openings for adequate clearance.  Make sure you 
make the smaller holes in close proximity of the larger hole, so the ribbon cable of the smaller 
gauges will still reach the main center display. 

 
 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.   Use the 12 included L - Brackets to secure the system to the dash.  

 

2.  From the front, place the main gauge and the four small gauges through the dash in the 

arrangement of your choice with both Fuel and Volts on the left side and Water and Oil on the 
right side.

 

5.875”   
diameter 
hole 

2.75”   

diameter 

hole 

Reviews: