SAFEGUARDING THE POINT OF OPERATION 

ANSI B11.2 - Hydraulic Power Presses - 

Safety Requirements for Construction, Care, and Use 

 
 
It is important that Dake press users have a clear understanding of their responsibility involving the care 
and use of their Dake hydraulic press, including point-of-operation safe guards. Dake strongly 
recommends that Dake press users obtain a copy of the current American National Standard Institute 
(ANSI) B11.2 standard, for a more complete understanding of their responsibilities.  
 
ANSI B11.2 states the following, relative to point of operation safeguarding: 
 
“Normally, only the employer (press user) can determine the requirements of the press productions 
system components, including the dies and methods for feeding. Therefore, the employer is ultimately 
responsible to designate and provide the point-of-

operation safeguarding system.” 

 
The standard also discusses additional responsibilities of the employer. Some of the key responsibilities 
are: 

  The employer is responsible for the safety, use, and care of the hydraulic power press production 

system.  

  The employer is responsible to consider the sources of hazards for all tasks to be implemented on 

the hydraulic power press production system.  

  The employer is required to eliminate, or control identified hazards in the scope of their work activity.  

  The employer is responsible for the training of personnel, caring for, inspecting, maintaining, and 

operating hydraulic press production systems to ensure their competence.  

  The employer is responsible to provide and ensure that point-of-operation safeguarding is used, 

checked, maintained, and where applicable, adjusted on every production operation performed on a 
press production system.  

 
  
 
A complete and current copy of the ANSI B.11.2 standard can be obtained by contacting the following: 

 

American National Standards Institute 

1430 Broadway 

New York, NY 10018 

 

AMT 

– The Association for Manufacturing Technology 

7901 Westpark Drive 

McLean, VA 22102 

 

 

Summary of Contents for 909250

Page 1: ...00 846 3253 www dakecorp com customerservice dakecorp com DAKE SINGLE PHASE DURA PRESS Force 50DA INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating Failure to follow safety instructions and labels could result in serious injury ...

Page 2: ...ND POLICY 4 SAFEGUARDING THE POINT OF OPERATION 5 SPECIFICATIONS 6 SAFETY 7 SET UP 9 PRESS PLACEMENT 9 FILLING THE PRESS WILL OIL 9 WIRING INSTRUCTIONS 10 OPERATION 10 BEFORE FIRST TIME OPERATION 10 MAINTENANCE 11 LUBRICATION 11 HYDRAULIC LINES AND FITTINGS 11 TROUBLESHOOTING Error Bookmark not defined EXPLODED VIEW PARTS LIST 14 ORDERING INFORMATION 16 ...

Page 3: ...the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth the manufacturer will repair or replace any portion of the product that proves defective in materials or workmanship The manufacturer retains the sole right and option after inspection to determine whethe...

Page 4: ...allation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid freight terms d Normal maintenance service or preventative maintenance and the parts used in connection with such service e Units and parts which have been altered or repaired other than by the manufact...

Page 5: ... by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item received without an RMA number clearly visible on the packaging will not be processed An RMA number can only be provided by the Dake Customer Service team and must be obtained prior to the return shipment R...

Page 6: ...ion safeguarding system The standard also discusses additional responsibilities of the employer Some of the key responsibilities are The employer is responsible for the safety use and care of the hydraulic power press production system The employer is responsible to consider the sources of hazards for all tasks to be implemented on the hydraulic power press production system The employer is requir...

Page 7: ...l 16 Pressing Speed 11 ipm Width between uprights 44 Max ram to table 41 3 4 Height 94 Base 55 x 36 Weight 3 450 lbs In the space provided record the serial number and model number of the machine This information is only found on the black and gold Dake tag shown below If contacting Dake this information must be provided to assist in identifying the specific machine Serial No Model No Install Date...

Page 8: ...ages in this manual and on your press safety labels Keep safety labels in good condition Replace missing or damaged safety labels Do not alter this press from its original design Do not make repairs or adjustments to any hydraulic system unless you are competent or working under competent supervision Only use Dake original parts This machine is intended to be operated by one person This person sho...

Page 9: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 8 REV052019 Label Placement View ...

Page 10: ... from any other objects or machines Press should be placed on level floor with base angles touching the floor at all points Use shims where necessary FILLING THE PRESS WILL OIL Fill the reservoir with DTE 24 Mobil hydraulic oil or equivalent a 50DA holds 3 gallons of oil Make sure the oil is new and be cautious no contaminants get in while filling the reservoir b Oil should be changed about once a...

Page 11: ...The leads on the motor must be changed to fit 220 volt 17 2 amps follow the diagram on the motor 2 Install plug and wire that fits the rating on the motor the plug and wire must be rated for the voltage and amperage listed on the motor OPERATION BEFORE FIRST TIME OPERATION 1 Make sure the reservoir is filled with 3 gallons of Mobil DTE 24 hydraulic fluid or equivalent 2 Turn the on off power toggl...

Page 12: ...ress well oiled for easier operation Also keep a light film of oil over the entire surface of the ram to prevent rust HYDRAULIC LINES AND FITTINGS If there is ever any maintenance done with the hydraulic components below is how to reinstall all components Item Part No 1 72050 2 73425 3 72047 4 302939 5 69671 6 72402 7 302183 8 302061 9 302224 ...

Page 13: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 12 REV052019 ELECTRIC SCHEMATIC ...

Page 14: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 13 REV052019 HYDRAULIC SCHEMATIC ...

Page 15: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 14 REV052019 EXPLODED VIEW PARTS LIST ...

Page 16: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 15 REV052019 ...

Page 17: ...019 Please contact factory for current prices ORDERING INFORMATION Parts are available for direct purchase from Dake or through a distributor When placing a parts order you will need to provide the part number name of part and model number All parts shipped F O B Factory in Grand Haven MI ...

Reviews: