Tetra
®
Power Supply GEPS12-25U-NA
Installation Guide
2
Power Supply Installation
NOTE: For installation in Canada, a disconnect switch of appropriate rating needs to be placed within 29.5 feet (9 meters) of
primary side of the power supply. The switch voltage rating shall not be less than the branch circuit voltage. The switch must
also support twice the amount of input current.
NOTE: When installing power supply, connect to the appropriate sized building breaker or disconnect device for line, neutral
and ground connections, in accordance with National Electric Code (NEC) Article 600 and all local regulations.
Connect the AC line to the black
or brown (line) and white or
blue (neutral) input wires of the
power supply using suitable wire
connectors.
Connect the supply wire that is
attached to the Tetra LED System
to the red (+) and black or blue (-)
output wires of the power supply
as outlined in the “Electrical
Connections” section of your LED
system’s Installation Instructions.
NOTE: To avoid overloading this
power supply with LED modules,
please refer to the specific module
loading guides.
Input
wires
White or blue
(neutral)
Black or brown
(line)
AC line
To Tetra LED System
Output
wires
Red (+)
Black or blue (-)
Mount the power supply. Mounting
the power supply base directly to
a thermally conductive installation
surface can improve thermal
performance.
NOTE: All electrical connections
should be suitably protected
from mechanical damage and the
environment. Seal all connections
exposed to water with electrical
grade self-hardening silicone.
OPTIONAL
A Weather Box (GEXNWB2) may be used to
house and seal Class 2 connections.
A) Insert wire connectors into weather box. Fill
with electrical grade silicone and close box.
B) Secure the weather box using a #6 or #8
(M2 or M3) screw.
Weather box
can be painted
Light engine
1
2
3
WARNING
RISK OF ELECTRIC SHOCK
AC input connections shall be
suitably enclosed.
A
B