Make  sure  the  field  piping  does  not  touch  any  compressor
components.

6

Seal the insulation ends (sealant etc.) (b, see above).

7

Wrap the field piping with vinyl tape (d, see above) to protect it
against sharp edges

8

If  the  outdoor  unit  is  installed  above  the  indoor  unit,  cover  the
stop  valves  with  sealing  material  to  prevent  condensed  water
on the stop valves from moving to the indoor unit.

NOTICE

Any exposed piping might cause condensation.

9

Reattach the service cover and the piping intake plate.

10

Seal all gaps to prevent snow and small animals from entering
the system.

WARNING

Provide adequate measures to prevent that the unit can be
used  as  a  shelter  by  small  animals.  Small  animals  that
make contact with electrical parts can cause malfunctions,
smoke or fire.

15.3.7

To check for leaks after charging
refrigerant

After charging refrigerant in the system an additional leak test must
be  performed.  Refer  to 

"16.9  To  check  for  refrigerant  leaks  after

charging"

 [

4

 39].

16

Charging refrigerant

16.1

Precautions when charging
refrigerant

WARNING

▪ Only  use  R32  as  refrigerant.  Other  substances  may

cause explosions and accidents.

▪ R32  contains  fluorinated  greenhouse  gases.  Its  global

warming  potential  (GWP)  value  is  675.  Do  NOT  vent
these gases into the atmosphere.

▪ When  charging  refrigerant,  ALWAYS  use  protective

gloves and safety glasses.

NOTICE

If  the  power  of  some  units  is  turned  off,  the  charging
procedure cannot be finished properly.

NOTICE

In case of a multiple outdoor system, turn on the power of
all outdoor units.

NOTICE

Be sure to turn ON the power 6 hours before operation in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

NOTICE

If operation is performed within 12 minutes after the indoor
and outdoor units are powered on, the compressor will not
operate  before  the  communication  is  established  in  a
correct way between outdoor unit(s) and indoor units.

NOTICE

Make  sure  all  connected  indoor  units  are  recognised  (see
[1‑10]  and  [1‑39]  in 

"18.1.7  Mode  1:  Monitoring

settings"

 [

4

 44]).

NOTICE

Before  starting  charging  procedures,  check  if  the
7‑segment  display  indication  of  the  outdoor  unit  A1P  PCB
is  as  normal  (see 

"18.1.4  To  access  mode  1  or  2"

  [

4

  43]).

If  a  malfunction  code  is  present,  see 

"21.1  Solving

problems based on error codes"

 [

4

 48].

NOTICE

Close  the  front  panel  before  any  refrigerant  charge
operation is executed. Without the front panel attached the
unit cannot judge correctly whether it is operating properly
or not.

NOTICE

In  case  of  maintenance  and  the  system  (outdoor  unit+BS
unit+field  indoor  units)  does  not  contain  any
refrigerant  any  more  (e.g.,  after  refrigerant  reclaim
operation),  the  unit  has  to  be  charged  with  its  original
amount  of  refrigerant  (refer  to  the  nameplate  on  the  unit)
and the determined additional refrigerant amount.

NOTICE

▪ Ensure that contamination of different refrigerants does

not occur when using charging equipment.

▪ Charging hoses or lines shall be as short as possible to

minimise the amount of refrigerant contained in them.

▪ Cylinders  shall  be  kept  in  an  appropriate  position

according to the instructions.

▪ Ensure that the refrigerating system is earthed prior to

charging the system with refrigerant. See 

"17 Electrical

installation"

 [

4

 39].

▪ Label the system when charging is complete.

▪ Extreme  care  shall  be  taken  not  to  overfill  the

refrigerating system.

NOTICE

Prior  to  charging  the  system,  it  shall  be  pressure  tested
with the appropriate purging gas. The system shall be leak
tested 

on 

completion 

of 

charging 

but 

prior 

to

commissioning.  A  follow  up  leak  test  shall  be  carried  out
prior to leaving the site.

16.2

About charging refrigerant

Once  vacuum  drying  is  finished,  additional  refrigerant  charging  can
start.

To speed up the refrigerant charging process, it is in case of larger
systems  recommended  to  first  pre-charge  a  portion  of  refrigerant
through  the  liquid  line  before  proceeding  with  the  actual  charging.
This  step  is  included  in  below  procedure  (see 

"16.5  To  charge

refrigerant"

  [

4

  37]).  It  can  be  skipped,  but  charging  will  take  longer

then.

A flow chart is available which gives an overview of the possibilities
and  actions  to  be  taken  (see 

"16.4  To  charge  refrigerant:  Flow

chart"

 [

4

 37]).

Summary of Contents for VRV 5 Series

Page 1: ...llation and operation manual VRV 5 heat recovery English Installation and operation manual VRV 5 heat recovery REYA8A7Y1B REYA10A7Y1B REYA12A7Y1B REYA14A7Y1B REYA16A7Y1B REYA18A7Y1B REYA20A7Y1B REMA5A...

Page 2: ...25 30 35 40 45 50 55 60 20 15 10 Lowest underground floor a m kg Amin m2 65 63 8 189 27 9 1 m kg Amin m2 150 50 6 160 54 0 170 57 4 180 60 7 189 63 8 27 9 1 190 63 8 30 10 1 200 63 8 40 13 5 50 16 8...

Page 3: ...20 21 22 23 24 25 v skladu z dolo bami vastavalt n uetele vadovaujantis io dokumento nuostatomis atbilsto i du standartu pras b m nasledovn mi ustanoveniami u standartlar n h k mlerine EN 60335 2 40...

Page 4: ...littu l mp tila TS TSmin Alhaisin matalapainepuolen l mp tila L C TSmax Suurinta sallittua painetta PS vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja...

Page 5: ...6 S I 2008 1597 Supply of Machinery Safety Regulations 2008 S I 2016 1091 Electromagnetic Compatibility Regulations 2016 following the provisions of BS EN 60335 2 40 as set out in A and judged positiv...

Page 6: ...the maximum allowable pressure PS M C Refrigerant N Setting of pressure safety device P bar Manufacturing number and manufacturing year refer to model nameplate K L M TSmin TSmax PS N P 40 20 61 R32 4...

Page 7: ...19 8 2 17 Symptom Hot air can be felt when the indoor unit is stopped 19 9 Relocation 19 10 Disposal 19 10 1 Eco Design requirements 19 For the installer 20 11 About the box 20 11 1 To remove the acce...

Page 8: ...dustry and on farms or for commercial use by lay persons Documentation set This document is part of a documentation set The complete set consists of General safety precautions Safety instructions that...

Page 9: ...als that are inherently resistant to corrosion or are suitably protected against corrosion WARNING Take sufficient precautions in case of refrigerant leakage If refrigerant gas leaks ventilate the are...

Page 10: ...cables first before separating the earth connection The length of the conductors between the power supply stress relief and the terminal block itself MUST be as such that the current carrying wires ar...

Page 11: ...on concerning use of the appliance in a safe way and understand the hazards involved Children SHALL NOT play with the appliance Cleaning and user maintenance SHALL NOT be made by children without supe...

Page 12: ...parts WARNING Before operating the unit be sure the installation has been carried out correctly by an installer Maintenance and service see 7 Maintenance and service 416 WARNING If the supply cord is...

Page 13: ...o be effective the unit MUST be electrically powered at all times after installation except for maintenance WARNING The refrigerant inside the unit is mildly flammable but normally does NOT leak If th...

Page 14: ...er Do NOT remove the front panel Some parts inside are dangerous to touch and appliance problems may happen For checking and adjusting the internal parts contact your dealer This operation manual offe...

Page 15: ...ation if the room temperature is low 20 C 6 3 2 To use the dry program To start 1 Press the operation mode selector button on the user interface several times and select program dry operation 2 Press...

Page 16: ...ll and result in injury NOTICE NEVER inspect or service the unit by yourself Ask a qualified service person to perform this work NOTICE Do NOT wipe the controller operation panel with benzine thinner...

Page 17: ...ming in Check if there are too many occupants in the room during cooling operation Check if the heat source of the room is excessive Check if direct sunlight enters the room Use curtains or blinds Che...

Page 18: ...om Fan operation is possible but cooling and heating do not work Immediately after the power is turned on The micro computer is getting ready to operate and is performing a communication check with al...

Page 19: ...in the outdoor unit does not stop after a short heating operation This is to prevent refrigerant from remaining in the compressor The unit will stop after 5 to 10 minutes 8 2 16 Symptom The inside of...

Page 20: ...YQ14 16 RYYQ8 12 kg ONLY FOR RYYQ8 20 MODELS DATE AMOUNT CALCULATE THE ADDITIONAL REFRIGERANT CHARGING AMOUNT BASED ON THE FORMULA BELOW BEFORE CHARGING SHIPMENT INDICATED ON THE MACHINE NAMEPLATE AND...

Page 21: ...f an R32 sensor located in the indoor unit or BS unit For more information about the SVS output see 17 8 To connect the external outputs 442 Indoor unit installation For installation of the indoor uni...

Page 22: ...ut PCB of the indoor unit of that specific room The outdoor SVS will trigger for any R32 leak detected in the complete system For BS units and indoor units SVS is only triggered when its own R32 senso...

Page 23: ...ction with the leak is now shut off from the rest of the system and the amount of refrigerant that can leak is significantly reduced Note In case 2 branch pipe ports are combined to a single branch pi...

Page 24: ...can lead to lower minimum room area requirements Note In case multiple indoor units are connected to the same branch pipe port the sum of the connected indoor unit capacity classes needs to be equal o...

Page 25: ...100 OK Ports C and D are combined and have to be considered as 1 branch pipe They only serve room 3 Using table a to find maximum capacity class of the indoor unit 250 The selected indoor unit is 200...

Page 26: ...erground floor NO Start installation Procedure to check if smallest area of lowest underground floor meets the requirements Start installation Derive maximum system charge See step 3 in above text Det...

Page 27: ...m to a residential location NOTICE The installation and any maintenance requires a professional with relevant EMC experience to install any specific EMC mitigation measures defined in the user instruc...

Page 28: ...s Stands under the unit must be at least 100 mm wide 100 mm 100 mm NOT allowed Allowed preferred installation The height of the foundation must at least be 150 mm from the floor In heavy snowfall area...

Page 29: ...ipe A is in case of multi connection the sum of the outdoor units connected upstream HP class Piping outer diameter mm Liquid pipe Suction gas pipe HP LP gas pipe 5 10 9 5 19 1 15 9 12 18 12 7 22 2 19...

Page 30: ...door unit capacity index Refrigerant branch kit 200 KHRQ23M20T 200 x 290 KHRQ23M29T9 290 x 640 KHRQ23M64T 640 KHRQ23M75T Concerning refnet headers choose from the following table in accordance with th...

Page 31: ...cal wiring through the knockout holes wrap the wiring with protective tape to prevent damage 15 2 2 To connect the refrigerant piping to the outdoor unit NOTICE Be sure to use the supplied accessory p...

Page 32: ...dust cap to prevent aging of O ring and risk of leakage To handle the service port Always use a charge hose equipped with a valve depressor pin since the service port is a Schrader type valve After ha...

Page 33: ...ng 2 21 until the outdoor unit has finished the initialisation Leak test and vacuum drying Checking the refrigerant piping involves Checking for any leakages in the refrigerant piping Performing vacuu...

Page 34: ...t and the copper flare 15 3 5 To perform vacuum drying To remove all moisture from the system proceed as follows 1 Evacuate the system for at least 2 hours to a target vacuum of 100 7 kPa 1 007 bar 5...

Page 35: ...l connected indoor units are recognised see 1 10 and 1 39 in 18 1 7 Mode 1 Monitoring settings 444 NOTICE Before starting charging procedures check if the 7 segment display indication of the outdoor u...

Page 36: ...each containing less than 63 8 kg refrigerant charge For factory charge refer to the unit name plate NOTICE The total refrigerant charge amount in the system MUST always be lower than 15 96 kg the num...

Page 37: ...ush BS3 to stop manual charging Charging is finished Fill in the amount on the additional refrigerant charge label Input the additional refrigerant amount via setting 2 14 Go to test run 16 5 To charg...

Page 38: ...door unit 6 Activate setting 2 20 to start the manual additional refrigerant charge mode For details see 18 1 8 Mode 2 Field settings 444 Result The unit will start operation 7 Open valve A and charge...

Page 39: ...ion CAUTION See 2 Specific installer safety instructions 48 to make sure this installation complies with all safety regulations 17 1 About electrical compliance This equipment complies with EN IEC 610...

Page 40: ...Multiply the above result by 1 1 49 0 A 1 1 53 9 A so the recommended fuse capacity would be 63 A NOTICE When using residual current operated circuit breakers be sure to use a high speed type 300 mA r...

Page 41: ...wiring After installing the transmission wires wrap them along with the onsite refrigerant pipes using finishing tape as shown in the illustration below d b e a d a c f a Liquid pipe b Gas pipe c High...

Page 42: ...ce is not OK Go to the next step 2 Turn ON the power and leave it on for 6 hours Result The compressor will heat up and evaporate any refrigerant in the compressor 3 Measure the insulation resistance...

Page 43: ...ly before turning on the power 18 1 4 To access mode 1 or 2 Initialisation default situation NOTICE Be sure to turn ON the power 6 hours before operation in order to have power running to the crankcas...

Page 44: ...n 0 Unit is currently not operating under low noise restrictions 1 Unit is currently operating under low noise restrictions 1 2 Shows the status of power consumption limitation operation 1 2 Descripti...

Page 45: ...g on the chosen level the noise level will be lowered The start and stop moments for this function are defined under setting 2 26 and 2 27 For more details about settings 2 26 and 2 27 see installer u...

Page 46: ...he commissioning instructions in this chapter a general commissioning checklist is also available on the Daikin Business Portal authentication required The general commissioning checklist is complemen...

Page 47: ...e the test run of the outdoor unit checks this confirmation for all BS units in the system See the BS unit installation and operation manual for more information NOTICE It is very important that all r...

Page 48: ...arried out the outdoor unit display will indicate and the indication Centralised control and Test run will display on the indoor unit user interface s Steps during the automatic connection check proce...

Page 49: ...re information R32 sensor malfunction in one of the indoor units c Check connection on PCB or actuator The system will continue operation but indoor unit in scope will stop operating Refer to the serv...

Page 50: ...s Check refrigerant amount recharge unit Refrigerant overcharge Stop valve closed Check refrigerant amount recharge unit Open stop valves Ambient temperature sensor malfunction R1T main PCB X18A Check...

Page 51: ...ect phase order Reversed power supply phase malfunction Correct phase order INV1 voltage power shortage Check if power supply is within range INV1 power phase loss Check if power supply is within rang...

Page 52: ...he alarm only and supervisor remote controller have no functionality The screen of the remote controller in alarm only and supervisor mode will be off Operation of the remote controller can be checked...

Page 53: ...e iTM and WAGO module can also be connected to generate an output signal in case of leak detection E g it can be used at a supervised location Please refer to installation manual of the iTM for furthe...

Page 54: ...4 Refer to the installation manual for connection wiring to indoor outdoor transmission F1 F2 and outdoor multi transmission Q1 Q2 5 When using the central control system connect outdoor outdoor trans...

Page 55: ...lectronic expansion valve inverter cooling Y7E 14 20 HP only Electronic expansion valve liquid injection Y2S Solenoid valve liquid pipe Y3S Solenoid valve high pressure low pressure gas pipe Y4S Solen...

Page 56: ...4P684060 1 2022 02 Copyright 2022 Daikin 4P684060 1 0000000M Verantwortung f r Energie und Umwelt...

Reviews: