background image

VAM350~2000FC
Total Heat Exchanger
HRV (Heat Reclaim Ventilation)
4P415947-1A – 2017.08

Installation manual

14

Examp

le

Wh

en adjusting the a

uto restart

 setting to o

n in th

e group setting 

mode, 

enter the

 mode No. "

18" setting sw

itch No. "

2" and

 set

ting position 

No. "02"

.

S

e

ttin

g

 mode

Se

tt

in

g

 

switch No.

Description of 

S

e

ttin

g

Set

ting posit

ion

 No.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

18

 (2

8)

7

Fre

sh

-up mode

No 

In

dicat

ion

Supp

ly

No

 

Indi

ca

tio

n

E

xhaust

In

dicat

ion

Supp

ly

Indi

ca

tio

n

E

xhaust

––

––

––

8

E

xt

e

rnal inpu

t te

rmina

l f

unct

ion 

sel

e

ctio

(bet

ween J1 and JC)

F

resh-up

Erro

r o

u

tp

ut

Er

ror out

put

st

op 

opera

tion

Forced

 o

ff

Fan 

fo

rced

 of

f

Air

 f

low 

up

Humidi

fy 

dr

ain erro

r

––

––

9

B

R

P4A5

0A

 ou

tp

ut 

switchi

ng 

sel

e

ctio

(bet

ween X3 an

X

4

)

Humidif

ier

/

heat

er 

out

put

Erro

r o

u

tp

ut

Fan out

put

(L

/H/UH)

Fa

n o

u

tp

ut

(H/UH)

Fan out

put

(U

H

)

Fa

n o

u

tp

ut

Fan 

out

put

Dra

in v

alv

out

put

30min

/

12hour

Drain valve 

ou

tpu

t

30

min/

8hour

Dra

in v

alv

out

put

30min

6ho

ur

Drain valve 

ou

tpu

t

30

min/

4hour

––

––

 (bet

ween X1

 an

d X2)

O

pera

tio

out

put

Ope

rat

ion 

out

pu

t

O

pera

tio

out

put

Ope

rat

ion 

out

put

O

pera

tio

out

put

24hour

 

vent

ila

tio

n

 

an

ope

rat

ion 

out

put

24ho

ur 

ve

nt

ilat

ion 

ou

tpu

t

Feed valve 

out

put

F

e

ed

 va

lv

ou

tpu

t

Feed valve 

out

put

F

e

ed

 va

lv

ou

tpu

t

––

––

Humid

ify unit

 co

nnect

ion

19

 (2

9)

1

Lo

w tap 

settin

g

Of

f

Ru

n 1

/15

(2

8min of

f/

2 min on)

Run 1/

10

(27min

 o

ff/

3 min 

on

)

Run 1/

6

(2

5min of

f/

5 min on)

Ru

n 1

/4

(2

2.5

m

in of

f/

7.

5 min on)

Run 1/

3

(2

0min of

f/

10

 min

 on

)

Ru

n 1

/2

(15min

 of

f/

15 min on)

Con

tin

uous oper

ati

o

n

St

ep

1

S

tep2

St

ep

3

S

tep4

St

ep5

Ste

p

6

S

tep7

S

te

p

8

2

S

A

 fan step

 set

ting*

St

ep1

S

tep

2

S

tep3

S

tep

4

S

tep5

St

ep

6

S

tep7

St

ep

8

S

tep9

S

te

p10

St

ep1

1

S

te

p12

St

ep1

3

S

te

p14

St

ep15

3

E

A

 fan step

 set

ting*

St

ep1

S

tep

2

S

tep3

S

tep

4

S

tep5

St

ep

6

S

tep7

St

ep

8

S

tep9

S

te

p10

St

ep1

1

S

te

p12

St

ep1

3

S

te

p14

St

ep15

4

24hou

r ven

til

ati

on 

se

tt

ing

Of

f

Ru

n 1

/15

(2

8min of

f/

2 min on)

Run 1/

10

(27min

 o

ff/

3 min 

on

)

Run 1/

6

(2

5min of

f/

5 min on)

Ru

n 1

/4

(2

2.5

m

in of

f/

7.

5 min on)

Run 1/

3

(2

0min of

f/

10

 min

 on

)

Ru

n 1

/2

(15min

 of

f/

15 min on)

Con

tin

uous oper

ati

o

n

St

ep

1

S

tep2

St

ep

3

S

tep4

St

ep5

Ste

p

5

S

tep7

S

te

p

8

7

Re

fer

ence co

ncent

rat

ion shif

fo

r vent

ilat

ion

 a

ir flo

w

 cont

rol 

(ppm)

0

+

20

0

+

400

+60

0

–2

00

–400

–60

0

8

S

to

p

 ven

til

ati

on 

by au

to

mati

ven

til

ati

on air fl

ow 

con

tro

l

A

llowed

N

o

t       

              

             

          

allowed

A

llowed

N

ot allowe

d

––

––

––

Fan

 r

e

sidual

 op

erat

ion

Of

f

Of

f

H

e

at

er

 

opera

tion

Heat

er 

ope

rat

ion

9

No

rmal ve

nt

ilat

ion t

ap on 

au

to

mat

ic vent

ilat

ion

 a

ir flow 

cont

rol

Inde

pend

ent

UH

In

depe

nden

t

H

VR

V

 cont

rol

UH

VR

V c

ont

rol

H

Cont

rol by 

CO

2

 sensor

––

––

––

1A

0

F

res

h up

 op

e

rat

ion

 

 

On

/O

ff

O

ff

O

n

––

––

––

––

NOTE

1.

F

actory set

tings are

 marked in grey backg

rounds.

2.

(*)

 Refer 

to technical data book for

 pressur

e dro

p cur

ve

s and

 selection o

f fan curves (

st

ep 1 to 15)

.

3.

T

he s

etting

 m

od

es

 a

re

 m

entio

ne

d as

 gro

up

 s

ett

ing

s. B

etw

ee

n pa

re

nth

ese

s ar

e th

e se

ttin

g m

od

es fo

r ind

iv

idu

al un

it c

ont

rol.

4.

Group n

umber setting for centr

alized co

ntroller

 

Mode N

o. 00: Group contr

oller

 

Mode N

o. 30: Individual controller

 

Rega

rding 

th

setting procedure

, r

efer to the section 

"G

roup

 number setting 

fo

r centr

alized contr

ol"

 in the operating

 

manual of either

 the on/of

f controlle

r or t

he ce

ntral con

troller

.

Summary of Contents for VAM350FC

Page 1: ...INSTALLATION MANUAL VAM350FC VAM500FC VAM650FC VAM800FC VAM1000FC VAM1500FC VAM2000FC Total Heat Exchanger HRV Heat Reclaim Ventilation Ceiling mounted duct type...

Page 2: ...50F 285 164 112 800 416 850 758 132 812 146 200 VAM500F 84 197 VAM650F 348 204 145 852 421 902 912 137 988 196 250 VAM800F 98 246 263 VAM1000F 1140 568 1190 VAM1500F 710 383 140 852 421 898 130 330 35...

Page 3: ...3 3 4 4...

Page 4: ...electrician and must comply with the applicable legislation Always use the air filter If the air filter is not used heat exchange elements will be clogged possibly causing poor performance and subseq...

Page 5: ...a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures 1 Air suction discharge grille option 2 Inspection hole 450 mm field s...

Page 6: ...or bolt with washer and nut Before installation check for foreign objects such as vinyl and paper remaining inside the fan housing Attach the indoor SA RA and outdoor EA OA ducts by refering to the du...

Page 7: ...lation equipment inside the ceiling 7 Insulate the duct and the wall electrically when a metal duct is to be penetrated through the metal lattice and wire lattice or metal lining of a wooden structure...

Page 8: ...Standard 1 group linked control system on page 16 Multi group 2 or more linked operation system Since all VRV units are connected to a single line in view of installation all VRV units are subjects f...

Page 9: ...l device All individual control on page 18 Zone control system Use of the centralized controller enables zone control via the centralized control line maximum of 64 zones The central controller displa...

Page 10: ...ch the line outside the terminal board of the unit in accordance with electrical equipment standards The branch must be sheathed so as to provide a degree of insulation equal to or greater than the po...

Page 11: ...VAM350F VAM500F VAM650F VRV HRV P1 P1 P1 P2 P2 P2 L N 1 2 Out VRV HRV L N L N 1 1 2 2 P1 P2 F1 F1 T1 T1 P2 P1 F1 F2 J2 J3 JC L N J1 1 2 5 3 4 4 6 7 6 1 Outdoor unit BS unit 2 Switch box 3 Indoor unit...

Page 12: ...nd washer 5 Grounding terminal 6 Terminal board 7 Transmission wiring terminal board P1 P2 8 Transmission wiring to optional remote controller 9 Power supply cable 10 Wires for connection of additiona...

Page 13: ...ing any of these options on the VAM1500 2000 it is necessary to prepare the fixing plate EKMPVAM When installing KRP2A51 it is necessary to prepare the fixing box KRP1BA101 For VAM350 500 650 800 1000...

Page 14: ...edure and settings 1 Press the INSPECTION TRIAL button 1 for more than four seconds with the unit in the normal mode to enter the local setting mode 2 For BRC301B51 use the VENTILATION MODE button up...

Page 15: ...stallation manual 12 6 Press the PROGRAM CANCEL button 6 once to enter the settings The code display will stop blinking and light up 7 Press the INSPECTION TRIAL button 1 to return to normal mode SETT...

Page 16: ...C 21 C 22 C 23 C 24 C 25 C 26 C 27 C 28 C 29 C 30 C 8 Centralized zone interlock setting No Yes 9 Pre heat time extension setting 0min 30min 60min 90min 18 28 0 External signal JC J2 Last command Pri...

Page 17: ...in on Continuous operation Step1 Step2 Step3 Step4 Step5 Step6 Step7 Step8 2 SA fan step setting Step1 Step2 Step3 Step4 Step5 Step6 Step7 Step8 Step9 Step10 Step11 Step12 Step13 Step14 Step15 3 EA fa...

Page 18: ...sor of the unit automatically changes the ventilation of the unit in Bypass mode and Heat Exchange mode Heat Exchange mode In this mode the air passes through the heat exchanger element to effect Tota...

Page 19: ...nditioner to make the initial settings for the HRV units Refer to Initial setting under Item List of Settings on page 13 Pre cool pre heat function When the pre cool pre heat function is set the HRV u...

Page 20: ...n the remote controller for HRV is connected initial settings should be performed using the remote controller for HRV Set the same numbers as described above when using the remote controller for air c...

Page 21: ...minals This system allows connection of four on off controllers It is necessary to assign a central control group number to each HRV unit and air conditioner Regarding the setting of the group number...

Page 22: ...structions of the centralized controller The centralized controller can be used to control the individual units in the zone for ventilation operation Remote control Monitor of operation The operation...

Page 23: ...Example When measured 900 ppm in linear control the unit runs 20 minutes in H next 10 minutes in L and after elapse judges again Essential wiring Refer to Opening the switch box on page 8 and to the i...

Page 24: ...temperatures after the air conditioning operation stops for the night If the following conditions are satisfied the operation starts and when the indoor temperature reaches the air conditioning settin...

Page 25: ...ISTOR PTC S1C S2C LIMIT SWITCH DAMPER MOTOR X1M TERMINAL A1P X2M TERMINAL OUTSIDE INPUT A1P X3M TERMINAL POWER SUPPLY V1R DIODE Z1F NOISE FILTER REMOTE CONTROLLER SS1 SELECTOR SWITCH OPTIONAL ACCESSOR...

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ...4P415947 1A 2017 08 Copyright 2015 Daikin...

Reviews: