
IM 1015/Page 53
© 2009
Daikin
800-432-1342
www.
DaikinApplied
.com
Figure 3: Circuit Board Jumpers
Table 3: Circuit Board Jumper Configuration
Application Notes
1
When no pipe sensor is used the main output controls
cooling and the secondary output controls heating.
2
The pipe sensor should be mounted on the main coil
input for water system operation and in the main duct
system for forced air operation.
3
The set point and operating mode will be retained on a
loss of power.
4
When using either a remote probe or pipe sensor, run
wiring away from any electrical motors or power wiring.
Power-Up Operating Sequence
Upon application of power, an MTA158 will go directly to
normal operation.
Jumper
Designation
Jumper Installed
ON
Jumper
Removed
JP1
Local Sensing
Remote Sensing
JP4
2 Pipe System*
4 Pipe System
AUTO
J P 4
JP
1
1
23
4
56
DIP S W IT C H
ON
1 2 3 4
5 6 7
10 11 12 13
15 16 17
Summary of Contents for ThinLine FCVC
Page 34: ...This page intentionally left blank Daikin IM 980 1 ...
Page 44: ...This page intentionally left blank Daikin IM 980 1 ...
Page 50: ...This page intentionally left blank Daikin IM 980 1 ...
Page 54: ...This page intentionally left blank DaikinIM 980 1 ...
Page 58: ...This page intentionally left blank Daikin IM 980 1 ...
Page 62: ...This page intentionally left blank Daikin IM 980 1 ...
Page 75: ...This page intentionally left blank Daikin IM 980 1 ...
Page 81: ...This page intentionally left blank Daikin IM 980 1 ...