![Daikin SkyAir FCAHG71GVEB Installer And User Manual Download Page 14](http://html1.mh-extra.com/html/daikin/skyair-fcahg71gveb/skyair-fcahg71gveb_installer-and-user-manual_3281063014.webp)
6 Installation
Installer and user reference guide
14
FCAHG71~140GVEB
Split system air conditioners
4P482875-1 – 2017.03
▪
Rising piping
. If necessary to make the slope possible, you can
install rising piping.
▪ Drain hose inclination: 0~75 mm to avoid stress on the piping
and to avoid air bubbles.
▪ Rising piping: ≤300 mm from the unit, ≤675 mm perpendicular
to the unit.
≤675
≤300
0~75
1000~1500
(mm)
b
a
b
c
a
d
d
a
Metal clamp (accessory)
b
Drain hose (accessory)
c
Rising drain piping (vinyl pipe of 25 mm nominal diameter
and 32 mm outer diameter) (field supply)
d
Hanging bars (field supply)
▪
Condensation.
Take measures against condensation. Insulate
the complete drain piping in the building.
▪
Combining drain pipes.
You can combine drain pipes. Make
sure to use drain pipes and T-joints with a correct gauge for the
operating capacity of the units.
≥100
≤
675
(mm)
a
a
T-joint
To connect the drain piping to the indoor unit
NOTICE
Incorrect connection of the drain hose might cause leaks,
and damage the installation space and surroundings.
1
Push the drain hose as far as possible over the drain pipe
connection.
2
Tighten the metal clamp until the screw head is less than 4 mm
from the metal clamp part.
3
Check for water leaks (see
4
Install the insulation piece (drain pipe).
5
Wind the large sealing pad (= insulation) around the metal
clamp and drain hose, and fix it with cable ties.
6
Connect the drain piping to the drain hose.
≤
4 mm
A
A'
A-A'
A
A'
f
6
5
2
c
e
4
b
a
d
b
a
d
c
3
1
2~6
1
a
Drain pipe connection (attached to the unit)
b
Drain hose (accessory)
c
Metal clamp (accessory)
d
Large sealing pad (accessory)
e
Insulation piece (drain pipe) (accessory)
f
Drain piping (field supply)
To check for water leaks
The procedure differs depending on whether electrical wiring is
already finished. When electrical wiring is not finished yet, you need
to temporarily connect the user interface and power supply to the
unit.
When electrical wiring is not finished yet
1
Temporarily connect electrical wiring.
▪ Remove the switch box cover (a).
▪ Connect the user interface (b).
▪ Connect the power supply (1~ 220-240 V 50/60 Hz) and
earth (c).
▪ Reattach the switch box cover (a).
b
a
c
Forced OFF
Transm.
T1 T2
2
Turn ON the power.
3
Start cooling operation (see
"8.4 To perform a test run" on
4
Gradually pour approximately 1 l of water through the air
discharge outlet, and check for leaks.