![Daikin SkyAir FCAHG100GVEB Installer And User Manual Download Page 12](http://html1.mh-extra.com/html/daikin/skyair-fcahg100gveb/skyair-fcahg100gveb_installer-and-user-manual_502526012.webp)
6 Installation
Installer and user reference guide
12
FCAHG71~140GVEB
Split system air conditioners
4P482875-1 – 2017.03
5.3.2
Refrigerant piping insulation
▪ Use polyethylene foam as insulation material:
▪ with a heat transfer rate between 0.041 and 0.052 W/mK (0.035
and 0.045 kcal/mh°C)
▪ with a heat resistance of at least 120°C
▪ Insulation thickness
Ambient
temperature
Humidity
Minimum thickness
≤30°C
75% to 80% RH
15 mm
>30°C
≥80% RH
20 mm
5.4
Preparing electrical wiring
5.4.1
About preparing electrical wiring
INFORMATION
Also read the precautions and requirements in the
"General safety precautions" chapter.
WARNING
▪ If the power supply has a missing or wrong N-phase,
equipment might break down.
▪ Establish proper earthing. Do NOT earth the unit to a
utility pipe, surge absorber, or telephone earth.
Incomplete earthing may cause electrical shock.
▪ Install the required fuses or circuit breakers.
▪ Secure the electrical wiring with cable ties so that the
cables do NOT come in contact with sharp edges or
piping, particularly on the high-pressure side.
▪ Do NOT use taped wires, stranded conductor wires,
extension cords, or connections from a star system.
They can cause overheating, electrical shock or fire.
▪ Do NOT install a phase advancing capacitor, because
this unit is equipped with an inverter. A phase
advancing capacitor will reduce performance and may
cause accidents.
WARNING
▪ All wiring must be performed by an authorized
electrician and must comply with the applicable
legislation.
▪ Make electrical connections to the fixed wiring.
▪ All components procured on the site and all electrical
construction
must
comply
with
the
applicable
legislation.
WARNING
ALWAYS use multicore cable for power supply cables.
6
Installation
6.1
Overview: Installation
This chapter describes what you have to do and know on-site to
install the system.
Typical workflow
Installation typically consists of the following stages:
▪ Mounting the outdoor unit.
▪ Mounting the indoor unit (+ decoration panel).
▪ Connecting the refrigerant piping.
▪ Checking the refrigerant piping.
▪ Charging refrigerant.
▪ Connecting the electrical wiring.
▪ Finishing the outdoor installation.
▪ Finishing the indoor installation.
6.2
Mounting the indoor unit
6.2.1
Precautions when mounting the indoor
unit
INFORMATION
Also read the precautions and requirements in the
following chapters:
▪ General safety precautions
▪ Preparation
6.2.2
Guidelines when installing the indoor unit
INFORMATION
Optional equipment.
When installing optional equipment,
also read the installation manual of the optional equipment.
Depending on the field conditions, it might be easier to
install the optional equipment first.
▪
In case of installation with a fresh air intake kit
. Install the
fresh air intake kit always
before
installing the unit.
▪
Decoration panel
. Install the decoration panel always
after
installing the unit.
▪
Ceiling strength
. Check whether the ceiling is strong enough to
support the weight of the unit. If there is a risk, reinforce the ceiling
before installing the unit.
▪ For existing ceilings, use anchors.
▪ For new ceilings, use sunken inserts, sunken anchors or other
field supplied parts.
A
c
b
d
e
a
A
50~100 mm
: In case of installation with standard panel
100~150 mm
: In case of installation with fresh air intake kit
130~180 mm
: In case of installation with self-cleaning
decoration panel
a
Ceiling slab
b
Anchor
c
Long nut or turnbuckle
d
Suspension bolt
e
Suspended ceiling
▪
Suspension bolts.
Use M8~M10 suspension bolts for installation.
Attach the hanger bracket to the suspension bolt. Fix it securely
using a nut and washer from the upper and lower sides of the
hanger bracket.
(mm)
780
710
a1
b
b
a2
c
4×
a1
Nut (field supply)
a2
Double nut (field supply)