![Daikin Sky Air Advance RZA200D7Y1B Installation Manual Download Page 15](http://html.mh-extra.com/html/daikin/sky-air-advance-rza200d7y1b/sky-air-advance-rza200d7y1b_installation-manual_501971015.webp)
5 Commissioning
Installation manual
15
250D7Y1B
Sky Air Advance-series
4P573384-1 – 2019.04
In case a wireless user interface is used: The
indoor unit
decoration panel
with infrared receiver is installed.
The
outdoor unit
is properly mounted.
The following
field wiring
has been carried out according
to this document and the applicable legislation:
▪ Between the local supply panel and the outdoor unit
▪ Between the outdoor unit and the indoor unit (master)
▪ Between the indoor units
There are NO
missing phases
or
reversed phases
.
The system is properly
earthed
and the earth terminals
are tightened.
The
fuses
or locally installed protection devices are
installed according to this document, and have NOT been
bypassed.
The
power supply voltage
matches the voltage on the
identification label of the unit.
There are NO
loose connections
or damaged electrical
components in the switch box.
The
insulation resistance
of the compressor is OK.
There are NO
damaged components
or
squeezed
pipes
on the inside of the indoor and outdoor units.
There are NO
refrigerant leaks
.
The correct pipe size is installed and the
pipes
are
properly insulated.
The
stop valves
(gas and liquid) on the outdoor unit are
fully open.
5.2
To perform a test run
This task is only applicable when using the BRC1E52 or BRC1E53
user interface. When using any other user interface, see the
installation manual or service manual of the user interface.
NOTICE
Do not interrupt the test run.
INFORMATION
Backlight.
To perform an ON/OFF action on the user
interface, the backlight does not need to be lit. For any
other action, it needs to be lit first. The backlight is lit for
±30 seconds when you press a button.
1
Perform introductory steps.
#
Action
1
Open the liquid stop valve and gas stop valve by
removing the cap and turning counterclockwise with a
hex wrench until it stops.
2
Close the service cover to prevent electric shocks.
3
Turn ON power for at least 6 hours before starting
operation to protect the compressor.
4
On the user interface, set the unit to cooling operation
mode.
2
Start the test run
#
Action
Result
1
Go to the home menu.
Cool
Set to
28
°C
#
Action
Result
2
Press at least 4 seconds.
The Service Settings menu
is displayed.
3
Select Test Operation.
Return
Setting
Service Settings 1/3
Test Operation
Maintenance Contact
Field Settings
Demand
Min Setpoints Differential
Group Address
4
Press.
Test Operation is
displayed on the home
menu.
Cool
Return
Setting
Test Operation
5
Press within 10 seconds.
Test run starts.
3
Check operation for 3 minutes.
4
Check operation of the airflow direction (only applicable for
indoor units with swing flaps).
#
Action
Result
1
Press.
Return
Setting
Return
Setting
Air Volume/direction
Air Volume
Direction
Position 0
Low
2
Select Position 0.
Return
Setting
Return
Setting
Air Volume/direction
Air Volume
Direction
Low
Position 0
3
Change the position.
If the airflow flap of the
indoor unit moves,
operation is OK.
If not, operation is not OK.
4
Press.
The home menu is
displayed.
5
Stop the test run.
#
Action
Result
1
Press at least 4 seconds.
The Service Settings menu
is displayed.
2
Select Test Operation.
Return
Setting
Service Settings 1/3
Test Operation
Maintenance Contact
Field Settings
Demand
Min Setpoints Differential
Group Address
3
Press.
The unit returns to normal
operation, and the home
menu is displayed.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 19: ......
Page 20: ...4P573384 1 2019 04 Copyright 2019 Daikin 4P573384 1 0000000S ...