![Daikin Service Checker TYPE 3.1 Instruction Manual Download Page 14](http://html.mh-extra.com/html/daikin/service-checker-type-3-1/service-checker-type-3-1_instruction-manual_501862014.webp)
- 13 -
Chapter 2 Connection to air- conditioner
V
Using optional cable V (blue), connect to measuring instrument. To make V valid,
place the upper switch in V side. V and Th6 are not possible to use
simultaneously. The conversion of a voltage signal from measuring instrument into
voltage value is set by periodical recording in the
“
4.2 Setting of records
”
of TYPE 3
software.
(Note)
In case of shifting [Th5] to [A] or [Th6] to [V] by using the switch of the
Checker TYPE 3, shift at a screen before the screen of [Display of network
map], otherwise, operation data will not be correctly recorded.
2) Set the sensor part to air conditioning systems.
* When measuring current and voltage, be sure to input a voltage signal of 0-5VDC or
0-1VDC via the measuring instrument to the sensor connectors of the Checker TYPE
3.
CAUTION
Please always use the sensors of Sensor Kit (Parts Number: 999107T
)