![Daikin RZQ100HY4A Service Manual Download Page 10](http://html1.mh-extra.com/html/daikin/rzq100hy4a/rzq100hy4a_service-manual_2460014010.webp)
Procedure to Remove PCB Assy (3)
Si281317
8
Removal Procedure
6. Procedure to Remove PCB Assy (3)
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
3. Remove the PCB unit (for
inverter).
1
Unscrew the 4 screws
that fix the PCB and the
radiation fin.
2
Disengage the 2 hooks,
and then while peeling
off silicon, remove the
PCB (for inverter).
3
Disengage the 4
mounting screws to
remove the radiation
fin.
PCB mounting plate
Radiation fin