5. 

Purging air and checking gas leakage

   WARNING

• Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle.
• When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
• R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
• Use a vacuum pump for R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum 

pump or the unit.

• When piping work is completed, it is necessary to purge the air and check for gas 

leakage.

• If using additional refrigerant, perform air purging from the refrigerant pipes and indoor 

unit using a vacuum pump, then charge additional refrigerant.

• Use a hexagonal wrench (3/16 inch (4mm)) to operate the stop valve rod.
• All refrigerant pipe joints should be tightened with a torque wrench at the specified 

tightening torque.

1)  Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve’s service port.

2)  Fully open gauge manifold’s low-pressure valve (Lo) and completely close its high-pressure valve (Hi).  

(High-pressure valve subsequently requires no operation.)

3)   Do vacuum pumping and make sure that the compound pressure gauge reads –29.9inHg (–0.1MPa).*1

4)  Close gauge manifold’s low-pressure valve (Lo) and stop vacuum pump.  

(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2

5)  Remove caps from liquid stop valve and gas stop valve.

6)  Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal wrench to open valve. 

Close it after 5 seconds, and check for gas leakage. 
Using soapy water, check for gas leakage from indoor unit’s flare and outdoor unit’s flare and valve rods. 
After the check is complete, wipe all soapy water off.

7)  Disconnect charging hose from gas stop valve’s service port, then fully open liquid and gas stop valves. 

(Do not attempt to turn valve rod beyond its stop.)

8)  Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.

*1. Pipe length vs. vacuum pump run time

Pipe length

Up to 49.2ft (15m)

More than 49.2ft (15m)

Run time

Not less than 10 min.

Not less than 15 min

*2.  If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists. Check 

all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).

Gauge 

manifold

Compound 

pressure gauge

Pressure meter

Low-pressure 

valve

High-pressure 

valve

Charging 

hoses

Vacuum pump

Valve caps

Service port

Liquid 

stop 

valve

Gas 

stop 

valve

01_EN_3P300674-3.indd   7

10/13/2011   2:23:52 PM

Summary of Contents for RXS30LVJU

Page 1: ...it series Fran ais Espa ol Manuel dinstallation S rie split R410A Manual de instalaci n Serie Split R410A INSTALLATION MANUAL R410A Split Series Models RXS30LVJU RXS36LVJU RKS30LVJU RKS36LVJU 00_CV_3P...

Page 2: ...s so that children will not play with them Children playing with plastic bags face the danger of death by suffocation Do not install unit in an area where flammable materials are present due to risk o...

Page 3: ...e to install a ground fault circuit interrupter breaker may result in electrically shocks or fire personal injury CAUTION Do not install the air conditioner where gas leakage would be exposed to open...

Page 4: ...ything under the unit which must be kept away from moisture NOTE Cannot be installed hanging from ceiling or stacked CAUTION When operating the air conditioner in a low outdoor ambient temperature be...

Page 5: ...e below the ceiling surface 9 7 8 250 from wall Allow space for piping and electrical servicing Right side plate 13 3 4 350 Clamping material Insulation tube Bottom frame Tape Also insulate the connec...

Page 6: ...ain socket A drain caps B and a drain hose with the outdoor unit Otherwise drain water may freeze impairing heating performance 1 Insert drain receiver C onto drain socket A and drain cap B beyond 4 p...

Page 7: ...flare nuts to prevent damage to the flare nuts and gas leakage Flare nut tightening torque Liquid side 3 8 inch 9 5mm 24 1 29 4ft lbf 32 7 39 9N m Gas side 5 8 inch 15 9mm 45 6 55 6ft lbf 61 8 75 4N...

Page 8: ...e gauge reads 29 9inHg 0 1MPa 1 4 Close gauge manifold s low pressure valve Lo and stop vacuum pump Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swi...

Page 9: ...as possible Use a pipe bender for bending 7 2 Selection of copper and heat insulation materials When using commercial copper pipes and fittings observe the following 1 Insulation material Polyethylen...

Page 10: ...cooling operation switch SW1 Wiring WARNING Do not use tapped wires stranded wires extension cords or starburst connections as they may cause overheating electrical shock or fire Do not use locally pu...

Page 11: ...ng the binding band as shown in the gure Secure rmly making sure no outside pressure is exerted on the terminals Power supply terminal block L1 L2 1 2 3 Use the speci ed wires and connect them securel...

Page 12: ...s designed for facilities such as equipment or computer rooms It is never to be used in a residence or office where people occupy the space 1 You can expand the operation range to 14 F 10 C by turning...

Page 13: ...Carry out the test operation in accordance with the operation manual to ensure that all functions and parts such as fin movement are working properly The air conditioner requires a small amount of po...

Page 14: ...3P300674 3 M11B136 1111 HT Two dimensional bar code is a code for manufacturing 00_CV_3P300674 3 indd 2 10 21 2011 1 32 12 PM...

Reviews: