background image

English

7

5.

Purging air and checking gas leakage

• When piping work is completed, it is necessary to purge the air and check for gas leakage.

 WARNING

• Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle.
• When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
• R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
• Use a vacuum pump for R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum 

pump or the unit.

• If using additional refrigerant, perform air purging from the refrigerant pipes and 

indoor unit using a vacuum pump, then charge additional refrigerant. 

• Use a hexagonal wrench (3/16 inch (4mm)) to operate the stop valve rod.
• All refrigerant pipe joints should be tightened with a torque wrench at the specified 

tightening torque.

*1. Pipe length vs. vacuum pump run time.  

*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists.  Check 

all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).

1) Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve’s service port.

2) Fully open gauge manifold’s low-pressure valve (Lo) and completely close its high-pressure valve (Hi).  

(High-pressure valve subsequently requires no operation.)

3)  Do vacuum pumping and make sure that the compound pressure gauge reads –29.9inHg (–0.1MPa).*1.

4) Close gauge manifold’s low-pressure valve (Lo) and stop vacuum pump.  

(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2.

5) Remove caps from liquid stop valve and gas stop valve.

6) Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal wrench to open valve. 

Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit’s flare and outdoor unit’s flare and valve rods.  
After the check is complete, wipe all soapy water off.

7) Disconnect charging hose from gas stop valve’s service port, then fully open liquid and gas stop valves.

(Do not attempt to turn valve rod beyond its stop.)

8) Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.

Pipe length

Up to 49.2ft (15m)

Run time

Not less than 10 min.

Compound 
pressure gauge

Pressure 
meter

High-
pressure 
valve

Low-pressure 
valve

Vacuum pump

Service port

Liquid 
stop 
valve

Valve caps

Gas stop valve

Charging 
hoses

Gauge 
manifold

01_EN_3P253189-4E.fm  Page 7  Monday, September 6, 2010  4:20 PM

Summary of Contents for RXS09JEVJU

Page 1: ...XS12JEVJU RKS12JEVJU RXN09JEVJU RKN09JEVJU RXN12JEVJU RKN12JEVJU English Fran ais Espa ol Installation manual R410A Split series Manuel d installation S rie split R410A Manual de instalaci n Serie Spl...

Page 2: ...t children will not play with them Children playing with plastic bags face the danger of death by suffocation Do not install unit in an area where flammable materials are present due to risk of explos...

Page 3: ...ead to equipment damage and personal injury Be sure to install a ground fault circuit interrupter breaker Failure to install a ground fault circuit interrupter breaker may result in electrically shock...

Page 4: ...feet 3m away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out o...

Page 5: ...ired for refrigerant pipe exceeding 33ft 10m in length Be sure to add the proper amount of additional refrigerant Failure to do so may result in reduced perfomance The suggested shortest pipe length i...

Page 6: ...When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necessary follow the procedures below 2 Drain work Heat...

Page 7: ...ts and gas leakage Align the centers of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches A Check Flare s inner surface must be flaw free The...

Page 8: ...anifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do...

Page 9: ...4 to 0 030Btu fth F 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 230 F 110 C max Choose heat insulation materials that will withstand this temperature 2 Be sure to insula...

Page 10: ...eration to stop press the indoor unit ON OFF button Using the main unit s remote controller 1 Press the ON OFF button Operation will start 2 Press the TEMP button and the MODE button at the same time...

Page 11: ...before wiring A protection plate is fixed for protection from the high voltage section Before staring wiring work dismount the protection plate by removing the 2 screws and dismount the conduit mount...

Page 12: ...s with the work may cause heat and fires 3 Pull the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop Strip wire end to this point Excessive strip length may c...

Page 13: ...tion in accordance with the operation manual to ensure that all functions and parts such as fin movement are working properly The air conditioner requires a small amount of power in its standby mode I...

Page 14: ...1010 HT 3P253189 4E M09B111C Two dimensional barcodeisacode for manufacturing 66163045 00_CV_3P253189 4E fm Page 2 Monday September 6 2010 4 18 PM...

Reviews: