![background image](http://html1.mh-extra.com/html/daikin/rxq35amv1b/rxq35amv1b_installers-reference-manual_4205177032.webp)
7
|
Piping installation
Installer reference guide
32
RXQ-A_ARXQ-A
R32 split series
4P513661-11P – 2021.11
7 Piping installation
In this chapter
7.1 Preparing refrigerant piping
7.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the
CAUTION
Piping and joints of a split system shall be made with permanent joints when inside
an occupied space except joints directly connecting the piping to the indoor units.
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant.
▪
Foreign materials inside pipes (including oils for fabrication) must be
≤30 mg/10 m.
Refrigerant piping diameter
Pipe outer diameter (mm)
Liquid piping
Gas piping
Ø6.4
Ø9.5
Refrigerant piping material
▪
Piping material:
Phosphoric acid deoxidised seamless copper.
▪
Flare connections:
Only use annealed material.
▪
Piping temper grade and thickness: