background image

8 Finishing the outdoor unit installation

Installation manual

11

RXQ-A_ARXQ-A
R32 split series
3P664524-2A – 2021.07

8

Finishing the outdoor unit
installation

8.1

To finish the outdoor unit
installation

DANGER: RISK OF ELECTROCUTION

▪ Make sure that the system is earthed properly.

▪ Turn OFF the power supply before servicing.

▪ Install  the  switch  box  cover  before  turning  ON  the

power supply.

1

Insulate and fix the refrigerant piping and cables as follows:

g

b

a

f

e

c

d

a

Gas pipe

b

Gas pipe insulation

c

Interconnection cable

d

Field wiring (if applicable)

e

Liquid pipe

f

Liquid pipe insulation

g

Finishing tape

2

Install the service cover.

9

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

9.1

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit MUST be closed. Power-up the
unit after it is closed.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

9.2

Checklist during commissioning

To perform an 

air purge

.

To perform a 

test run

.

9.3

To perform a test run

INFORMATION

If the unit runs into an error during commissioning, see the
service manual for the detailed troubleshooting guidelines.

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

INFORMATION

▪ Even if the unit is turned OFF, it consumes electricity.

▪ When the power turns back on after a power break, the

previously selected mode will be resumed.

10

Maintenance and service

NOTICE

General  maintenance/inspection  checklist.

  Next  to  the

maintenance  instructions  in  this  chapter,  a  general
maintenance/inspection  checklist  is  also  available  on  the
Daikin Business Portal (authentication required).

The 

general 

maintenance/inspection 

checklist 

is

complementary  to  the  instructions  in  this  chapter  and  can
be  used  as  a  guideline  and  reporting  template  during
maintenance.

Summary of Contents for RXQ25AMV1B

Page 1: ...Installation manual R32 split series English Installation manual R32 split series RXQ25AMV1B RXQ35AMV1B ARXQ25AMV1B ARXQ35AMV1B...

Page 2: ...jem da se uporabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodyt...

Page 3: ...ation servicing maintenance repair and applied materials follow the instructions from Daikin and in addition comply with applicable legislation and are performed by qualified persons only In Europe an...

Page 4: ...the valves before flaring is complete This would cause refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT start the unit if it is vacuumed Charging refrigerant see 6 Charging refrigerant 48 WARNI...

Page 5: ...ALDING CAUTION Do NOT perform the test operation while working on the indoor units When performing the test operation NOT ONLY the outdoor unit but the connected indoor unit will operate as well Worki...

Page 6: ...und reflections INFORMATION The sound pressure level is less than 70 dBA The outdoor unit is designed for outdoor installation only and for ambient temperatures within the following ranges unless othe...

Page 7: ...ping material Piping material Phosphoric acid deoxidised seamless copper Flare connections Only use annealed material Piping temper grade and thickness Outer diameter Temper grade Thickness t a 6 4 mm...

Page 8: ...5 3 1 To check for leaks NOTICE Do NOT exceed the unit s maximum working pressure see PS High on the unit name plate NOTICE ALWAYS use a recommended bubble test solution from your wholesaler NEVER use...

Page 9: ...nt 6 4 To charge additional refrigerant WARNING Only use R32 as refrigerant Other substances may cause explosions and accidents R32 contains fluorinated greenhouse gases Its global warming potential G...

Page 10: ...e at the terminals of main circuit capacitors or electrical components before servicing The voltage MUST be less than 50 V DC before you can touch electrical components For the location of the termina...

Page 11: ...nt leaks The refrigerant pipes gas and liquid are thermally insulated The correct pipe size is installed and the pipes are properly insulated The stop valves gas and liquid on the outdoor unit are ful...

Page 12: ...verview below by in the part code Symbol Meaning Symbol Meaning Circuit breaker Protective earth Connection Protective earth screw Connector A Rectifier Earth Relay connector Field wiring Short circui...

Page 13: ...witch low S T Thermostat S RH Humidity sensor S W SW Operation switch SA F1S Surge arrester SR WLU Signal receiver SS Selector switch SHEET METAL Terminal strip fixed plate T R Transformer TC TRC Tran...

Page 14: ......

Page 15: ......

Page 16: ...3P664524 2A 2021 07 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...

Reviews: