4 Unit installation
Installation manual
6
RXF20~42C5V1B
Daikin room air conditioner
3P519299-10S – 2020.08
a
General safety precautions
b
Outdoor unit installation manual
c
Fluorinated greenhouse gases label
d
Multilingual fluorinated greenhouse gases label
e
Drain plug (located on the bottom of the packing case)
4
Unit installation
4.1
Preparing the installation site
WARNING
The appliance shall be stored in a room without
continuously operating ignition sources (example: open
flames, an operating gas appliance or an operating electric
heater).
WARNING
Make sure installation, servicing, maintenance and repair
comply with instructions from Daikin and with applicable
legislation (for example national gas regulation) and are
executed only by authorised persons.
4.1.1
Installation site requirements of the
outdoor unit
Mind the following spacing guidelines:
≤1200
>150
>150
>50
>300
>300
(mm)
(mm)
a
b
b
a
a
Air outlet
b
Air inlet
It is recommended to install a baffle plate when the air outlet is
exposed to wind.
It is recommended to install the outdoor unit with the air inlet facing
the wall and NOT directly exposed to the wind.
b
a
b
c
a
Baffle plate
b
Prevailing wind direction
c
Air outlet
4.1.2
Additional installation site requirements
of the outdoor unit in cold climates
Protect the outdoor unit against direct snowfall and take care that the
outdoor unit is NEVER snowed up.
a
b
c
c
d
a
Snow cover or shed
b
Pedestal
c
Prevailing wind direction
d
Air outlet
It is recommended to provide at least 150 mm of free space below
the unit (300 mm for heavy snowfall areas). Additionally, make sure
the unit is positioned at least 100 mm above the maximum expected
level of snow. If necessary, construct a pedestal. See
In heavy snowfall areas it is very important to select an installation
site where the snow will NOT affect the unit. If lateral snowfall is
possible, make sure that the heat exchanger coil is NOT affected by
the snow. If necessary, install a snow cover or shed and a pedestal.
4.2
Mounting the outdoor unit
4.2.1
To provide the installation structure
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field
supply).
20 mm
300
470
192
(mm)
192
a
a
100 mm above expected level of snow