Installation manual
8
R(Y)P71~W1
Split System air conditioners
4PW14486-1B
C
HARGING
REFRIGERANT
Precaution for servicing
This unit requires additional charging of refrigerant according to the
length of pipe connected at the site. Charge the refrigerant to the
liquid pipe in its liquid state. Since R-407C is a mixed refrigerant, its
composition changes if charged in a state of gas and normal system
operation would no longer be assured.
On this model it is not necessary to charge additionaly if the piping
length
≤
30 m.
Over 30 m or for complete recharging, please charge based as
shown in
figure 2
,
figure 3
and
figure 4
, where the pipe length is
respectively L1, L1+L2+L3 and L1+L2+L3+L4.
Additional charging of refrigerant
■
Over 30 m please, add refrigerant quantity according to following
table.
For future servicing, mark with a circle the selected amount on the
tables below
For pair system
Table 1 Additional charging amount <unit: kg>
For twin/triple system
Please charge additionaly according to the following calculation.
(additional amount is R1+R2)
1.
G1: total length of
Ø
9.5 mm liquid piping
G2: total length of
Ø
6.4 mm liquid piping
2.a G1>30 m
calculate length over 30 m (=G1–30 m)
Based on this length decide R1, R2 in the table
b G
≤
30 m and G1+G2>30 m
calculate total length over
30
m (=G1+G2–30 m)
Based on this decide R2 in the table, R1=0
3.
Total additional charge amount
R=R1+R2 (kg)
Table 2 Length <unit: m>, additional charging amount <unit: kg>
Example 1
1
G1=L1+L2=35+7=42 m
G2=L3=5
2
Over
30
m
a
G1
–
30=12 m
➙
Ø9.5 R1=1.50 kg
b
G2=5 m
➙
Ø6.4 R2=0.30 kg
3
Refrigerant charge amount=R=R1+R2=1.50+0.30=1.80 kg
Example 2
1
G1=L1=5 m
G2=L2+L3+L4=17+17+20=54
2
Over
30
m
a
G1=5 m
➙
R1=0.0 kg
b
(G1+G2)
–
30=(5+54)
–
30=29
➙
Ø6.4 R2=0.90 kg
3
Refrigerant charge amount=R=R1+R2=0.0+0.9=0.9 kg
Complete charging of the refrigerant (after a leak,
etc.)
When the entire refrigerant pipe length is within 30 meters, charge
the refrigerant in accordance with the amount mentioned in the
nameplate, and when the pipe length exceeds 30 meters, the
charging amount mentioned in the nameplate and that required for
additional charging are to be totalled as the net charging amount.
When performing service on the unit requiring the
refrigerant system to be opened, refrigerant must be
evacuated according to local regulations.
On twin/triple application, piping length means sum of
main pipe and branch pipe.
Piping length is the 1 way length, gas or liquid.
Model
Connected piping length is between
Class
30-40m
40-50m
50-60m
60-70m
H/P
71 +0.50
+1.00
+1.50
+2.00
100-125
+0.75
+1.50
+2.25
+3.00
C/O
71-100-125
+0.25
+0.50
+0.75
+1.00
Model
Piping
Ø
Length exceeding 30 m
Class
0-10
10-20
20-30
30-40
40-50
H/P
71
Main
9.5
0.50
1.00
1.50
2.00
2.50
R1
100-125
9.5
0.75
1.50
2.25
3.00
3.75
71
Branch
9.5
0.30
1.00
1.50
2.00
2.50
R1
100-125
9.5
0.75
1.50
2.25
3.00
3.75
71-100-125
6.4
0.30
0.60
0.90
1.20
1.50
R2
C/O
71-100-125
Main
9.5
0.25
0.50
0.75
1.00
1.25
R1
Branch
9.5
0.25
0.50
0.75
1.00
1.25
6.4
0.15
0.30
0.45
0.60
0.75
R2
L2=7 (Ø9.5)
71 type
100 type
L1=35 (Ø9.5)
indoor
L3=5 (Ø6.4)
35 type
outdoor heat pump
L2=17 (Ø6.4)
45 type
indoor
125 type
L1=5 (Ø9.5)
L3=17 (Ø6.4)
45 type
outdoor heat pump
indoor
L4=20 (Ø6.4)
45 type
In case of complete recharge of the refrigerant, please first
execute vacuuming. Execute this vacuuming from the
service port. Do not use the port of the stop valve for
vacuuming. Vacuuming can not be executed completely
using such port.
Position of service port:
Heat pump: Heat pump units have 2 ports on the
piping. One between the liquid receiver and the 4-way
valve and another one between the heat exchanger
and the 4-way valve.
Cooling only: On the discharge pipe