Mounting
EN
19
FA Daikin/ROTEX PG - 05/2017
008.15 442 44_01 - EN
9. Fit the product with the bottom insulation and secure it with a washer and
a nut.
10.Connect the pipes of the heating circuit to the connections of the fittings
(no mechanical stress).
11.Fit the upper insulation.
1. Remove the upper insulation.
2. Hold the product to the wall and
align it with a level.
3. Draw six marks.
4. Interconnect the opposing marks.
5. Drill holes (Ø 10 mm) at the posi-
tion of the two centre marks.
6. Insert the enclosed dowels.
7. Screw the long hanger bolt into
the top hole.
8. Screw the short hanger bolt into
the bottom hole.
Summary of Contents for Rotex PGMK
Page 25: ......