![Daikin RKS71KAVMA Removal Procedure Download Page 21](http://html.mh-extra.com/html/daikin/rks71kavma/rks71kavma_removal-procedure_2459865021.webp)
Si001167
Removal of PCBs
Removal Procedure
19
3. Removal of PCBs
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Disconnect the
connectors [S52]
[S102] from the service
monitor PCB.
Preparation
Remove the electrical box
according to the "Removal of
Electrical Box".
2
Detach the 4 clamps
with pliers and remove
the service monitor
PCB.
3
Remove the screws of
the terminal board and
the earth wire.
4
Remove the selective
connector for standby
electricity saving.
Be careful not to lose the
connector.
(R13539)
Service monitor PCB
[S52]
[S102]
Clamp
(R13540)
(R16085)
Terminal board
Earth wire
(R13509)