Outdoor Unit Installation

3.

Flaring the pipe end 

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing 

downward so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

 WARNING

• Do not use mineral oil on flared part.
• Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
• Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
• Never install a drier to this R410A unit in order to guarantee its lifetime.
• The drying material may dissolve and damage the system.
• Incomplete flaring may cause refrigerant gas leakage.

4.

Refrigerant piping

 CAUTION

• Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
• To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A.)
• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.

Align the centers of both flares and tighten the flare nuts 3 or 4 turns by hand.  Then tighten them fully with the torque wrenches. 

A

Check

Flare’s inner 
surface must 
be flaw-free.

The pipe end must 
be evenly flared in 
a perfect circle.

Make sure that the 
flare nut is fitted.

(Cut exactly at 

right angles.)

 Remove burrs.

Flaring

Set exactly at the position shown below.

A

0-0.020 inch 

(0-0.5mm)

Clutch-type

Flare tool for R410A

0.039-0.059 inch 

(1.0-1.5mm)

Clutch-type (Rigid-type)

0.059-0.079 inch 

(1.5-2.0mm)

Wing-nut type (Imperial-type)

Conventional flare tool

Die

Flare nut tightening torque

 

Gas side

Liquid side

 

3/8 inch (9.5mm)

1/4 inch (6.4mm)

 24.1-29.4ft 

l

 lbf 

10.4-12.7ft 

l

 lbf

 

(32.7-39.9N 

l

 m) 

(14.2-17.2N 

l

 m)

Valve cap tightening torque

 

Gas side

Liquid side

 

3/8 inch (9.5mm)

1/4 inch (6.4mm)

 15.9-20.2ft 

l

 lbf 

15.9-20.2ft 

l

 lbf

 

(21.6-27.4N 

l

 m) 

(21.6-27.4N 

l

 m)

Service port cap 

7.9-10.8ft 

l

 lbf

tightening torque 

(10.8-14.7N 

l

 m)

Torque wrench

Piping union

Flare nut

Spanner

[Tighten]

Do not apply refrigeration 

oil to the outer surface.

Flare nut

Apply refrigeration oil to 

the inner surface of the 

flare.

Do not apply refrigeration 

oil to the flare nut avoid 

tightening with over torque.

[Apply oil]

01_EN_3P253189-4E.fm  Page 6  Monday, September 6, 2010  4:20 PM

Summary of Contents for RKN09JEVJU RXN12JEVJU RKN12JEVJU

Page 1: ...XS12JEVJU RKS12JEVJU RXN09JEVJU RKN09JEVJU RXN12JEVJU RKN12JEVJU English Fran ais Espa ol Installation manual R410A Split series Manuel d installation S rie split R410A Manual de instalaci n Serie Spl...

Page 2: ...t children will not play with them Children playing with plastic bags face the danger of death by suffocation Do not install unit in an area where flammable materials are present due to risk of explos...

Page 3: ...ead to equipment damage and personal injury Be sure to install a ground fault circuit interrupter breaker Failure to install a ground fault circuit interrupter breaker may result in electrically shock...

Page 4: ...feet 3m away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out o...

Page 5: ...ired for refrigerant pipe exceeding 33ft 10m in length Be sure to add the proper amount of additional refrigerant Failure to do so may result in reduced perfomance The suggested shortest pipe length i...

Page 6: ...When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necessary follow the procedures below 2 Drain work Heat...

Page 7: ...ts and gas leakage Align the centers of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches A Check Flare s inner surface must be flaw free The...

Page 8: ...anifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do...

Page 9: ...4 to 0 030Btu fth F 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 230 F 110 C max Choose heat insulation materials that will withstand this temperature 2 Be sure to insula...

Page 10: ...eration to stop press the indoor unit ON OFF button Using the main unit s remote controller 1 Press the ON OFF button Operation will start 2 Press the TEMP button and the MODE button at the same time...

Page 11: ...before wiring A protection plate is fixed for protection from the high voltage section Before staring wiring work dismount the protection plate by removing the 2 screws and dismount the conduit mount...

Page 12: ...s with the work may cause heat and fires 3 Pull the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop Strip wire end to this point Excessive strip length may c...

Page 13: ...tion in accordance with the operation manual to ensure that all functions and parts such as fin movement are working properly The air conditioner requires a small amount of power in its standby mode I...

Page 14: ...1010 HT 3P253189 4E M09B111C Two dimensional barcodeisacode for manufacturing 66163045 00_CV_3P253189 4E fm Page 2 Monday September 6 2010 4 18 PM...

Reviews: