![background image](http://html1.mh-extra.com/html/daikin/reyq72aatj-series/reyq72aatj-series_installation-manual_4702680015.webp)
12
English
INFORMATION
The piping branch by REFNET joints is possible in the downstream of
REFNET headers. Indoor unit total capacity at REFNET joints accord-
ing to the REFNET header are as follows.
REFNET joint
(Downstream of REFNET joint)
Indoor unit
REFNET header
Indoor unit
REFNET Header
Indoor unit total capacity
at REFNET joint
HQTRKRGU
HQTRKRGU
–
KHRP26M22H9
KHRP26M22HA
<18
KHRP25M33H9
KHRP25M33HA
KHRP26M33H9
KHRP26M33HA
KHRP25M72H9
KHRP25M72HA
KHRP26M72H9
KHRP26M72HA
KHRP25M73HU9
KHRP25M73HUA
KHRP26M73HU9
KHRP26M73HUA
Ű
• If the outdoor unit capacity type is 264 or more, an outdoor multi
connection piping kit and reducer piping kit are always required.
Description
Model name
Outdoor unit multi connection
piping kit
BHFP26P100U
BHFP26P100UA
Reducer piping kit
KHFP26P100UA
B(1B0DLQB959B,0LQGG
Summary of Contents for REYQ72AATJ Series
Page 50: ...47 English...