11. Pipe insulation
NOTE
Pipe insulation thickness provided below are guidelines only. Pipes
must be insulated with the appropriate thickness of insulation per ap-
plicable local/state or national codes.
• Insulation of pipes should be done after performing 10. Air tight test
CPFXCEWWOFT[KPIQPRCIG|
• Always insulate the suction gas pipe, high/low pressure gas pipe,
liquid pipe and pipe connections.
• Failing to insulate the pipes may cause leaking or burns.
Be sure to use insulation designed for HVAC equipment.
• Reinforce the insulation on the refrigerant piping according to the
installation environment. Condensation might form on the surface of
the insulation. Refer to the below.
- Ambient temperature : 86°F (30°C), humidity : 75% to 80% RH :
minimum thickness : 9/16 in. (15 mm).
-
+HVJGCODKGPVVGORGTCVWTGGZEGGFU(%CPFVJGJWOKFKV[
80% RH, then the minimum thickness is 3/4 in. (20 mm).
See the Engineering Data Book for detail.
• If there is a possibility that condensation on the stop valve might
drip down into the indoor unit through gaps in the insulation and
piping because the outdoor unit is located higher than the indoor
unit, this must be prevented by caulking the connections. (Refer to
VJGHQNNQYKPIƂIWTG
1
2
3
4
5
1
6
1 Insulation material
2 Caulking, etc.
3 Liquid pipe stop valve
4 Suction gas pipe stop
valve
5 High/low pressure gas
pipe stop valve
6 Connection pipe
12. Checking of device and installation conditions
Be sure to check the followings.
For those doing electrical work
1
Make sure there is no faulty transmission wiring or loosening of a
nut.
5GG6TCPUOKUUKQPYKTKPIEQPPGEVKQPRTQEGFWTGQPRCIG|
2
Make sure there is no faulty power wiring or loosening of a nut.
5GG2QYGTYKTKPIEQPPGEVKQPRTQEGFWTGQPRCIG|
3
Has the insulation of the main power circuit deteriorated?
Measure the insulation and check the insulation is above regular
value in accordance with relevant local and national regulations.
For those doing pipe work
1
Make sure piping size is correct.
5GG5GNGEVKQPQHRKRKPIOCVGTKCNQPRCIG|CPF5GNGE
VKQPQHTGHTKIGTCPVDTCPEJMKVUQPRCIG|
2
Make sure insulation work is done.
See 11. Pipe insulation.
3
Make sure there is no faulty refrigerant piping.
5GG2TGECWVKQPUQPTGHTKIGTCPVRKRKPIQPRCIG|
13.
/CMKPIƂGNFUGVVKPIU
6QEQPVKPWGVJGEQPƂIWTCVKQPQHVJGQWVFQQTWPKVUKVKUTGSWKTGFVQIKXG
some input to the printed circuit board of the unit. This chapter will
describe how manual input is possible by operating the push buttons/
DIP switches on the printed circuit board and reading the feedback
from the 7 segment displays.
For VRV REYQ-A series it is alternatively possible to make several
EQOOKUUKQPKPIƂGNFUGVVKPIUVJTQWIJCRGTUQPCNEQORWVGTKPVGTHCEG
(for this operation, an optional cable is required). The installer can
RTGRCTGVJGEQPƂIWTCVKQPQHHUKVGQP2%CPFCHVGTYCTFUWRNQCFVJG
EQPƂIWTCVKQPVQVJGU[UVGO*QYVQEQPPGEVVJGECDNGKUFGUETKDGFKP
%QPPGEVKPIVJG2%EQPƂIWTCVQTVQVJGQWVFQQTWPKVQPRCIG|
6JGEQPVGPVUQHVJGCEVWCNUGVVKPIUKUFKUEWUUGFCPFGZRNCKPGFKP
/QPKVQTKPIHWPEVKQPCPFƂGNFUGVVKPIUQPRCIG|
13.1. Accessing the push buttons on the printed circuit
board
+VKUPQVTGSWKTGFVQQRGPVJGEQORNGVGEQPVTQNDQZVQCEEGUUVJG
push buttons on the printed circuit board and read out the 7 segment
display (s).
1
Open the service window cover.
2
Open the inspection door.
1
2
OPEN
CLOSE
You can see 3 push buttons and 3
seven-segment displays and DIP
switches.
NOTE
Operate the switches and push buttons with an insulated stick (such
as a closed ballpoint pen) to avoid touching of live parts.