IM 738-2
31
Mechanical Installation:
RPS Factory Split at Fan
Phase II. Reassemble cabinet (Figure 39)
1
Reinstall top cap removed in Phase I, Step 1.
2
Caulk (watertight) ends of splice cap.
3
Caulk (watertight) vertical seam.
4
Install #10 screws (provided).
5
Install screws (.25–20 × .75) removed in Phase I, Step
6
Install splice cover (provided).
Figure 39. Reassemble cabinet
7
Reinstall top cap
saved in step 1
Caulk ends
of splice cap
See detail
Splice cover,
provided
#10 screws,
provided
Nut clip-on,
provided
Caulk
vertical
seam
Install screws
(.25 to 20 × .75)
saved from step 1
Summary of Contents for RDT-135c
Page 131: ...IM 738 2 129...