6
|
Unit installation
Installer reference guide
22
C FVXM25~50A
Split system air conditioners
4P625991-1C – 2021.09
6 Unit installation
In this chapter
6.1 Preparing the installation site
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
6.1.1 Installation site requirements of the indoor unit
INFORMATION
Also read the precautions and requirements in the
INFORMATION
The sound pressure level is less than 70 dBA.
WARNING
CVXM-A and FVXM-A Floor Standing range is allowed to be combined ONLY with
systems with total refrigerant amount <1.842 kg. Therefore in case of combination
with outdoor units 3MXM40N8 or 3MXM52N8, the total liquid refrigerant piping
length of the installation MUST be ≤30 m.
Summary of Contents for Perfera CVXM20A3V1B
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...4P625991 1C 2021 09 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...