Compressor
Si121561E
24
Removal Procedure
2
3
Remove the protection
bushing.
Disconnect the
compressor lead wires
and the overload
protector.
4
5
6
7
8
9
Remove the 2 sheets of
putty.
Heat up the brazed part
of the discharge side
pipe and disconnect it.
Heat up the brazed part
of the suction side pipe
and disconnect it.
Heat up the brazed part
of the accumulator and
disconnect it.
Remove the 2 nuts.
Lift up the compressor
and remove it.
Step
Procedure
Points
U (red)
V (yellow)
W (blue)
Protection bushing
Overload
protector
(R22504)
Putty
Nut
Putty
Compressor
Brazed part of
the discharge
side pipe
Brazed part of
the accumulator
Brazed part of the
suction side pipe
(R22506)