[Precautions for refrigerant cylinder]

At the time of refrigerant filling, check whether the siphon tube is 
provided. Then locate the cylinder so that the refrigerant will be filled in 
the state of liquid (see table below).
R410A is a mixed refrigerant, the composition of which may change 
and the normal operation of the system may not be possible if the 
refrigerant is filled in the state of gas.

[Check through sight glass]

CAUTION

• Fully open the shutoff valves on the liquid and gas sides after the 

refrigerant replenishment is finished.
The compressor will malfunction if the system is operated with the 
shutoff valves closed.

Apply a screw lock agent to the screws of the valve cover 
mounting parts and service ports.

(Otherwise, dew condensation water will intrude and freeze inside 
and cause cap deformation or damage, which may result in 
refrigerant gas leakage or compressor malfunctions.)

11. FIELD SETTINGS

Warning

Electric Shock Warning

• Securely close the control box lid before turning power on.
• Before turning power on, check through the inspection hole (on the 

left-hand side) of the control box lid that the operation switch is set 
to OFF.
If the operation switch is set to ON, the fan may rotate.

• Check the LED indicators on the PCB (A1P) of the outdoor unit 

through the inspection hole (on the right-hand side) of the control 
box lid after the outdoor unit is turned on (see the illustration).
(The compressor will not operate for approximately 2 minutes after 
the outdoor unit is turned on.
H2P blinks for the first five seconds when the power supply is 
turned on. If the equipment is normal, H2P will be turned off in five 
seconds. H2P lights for abnormality.)

Operating the push-button and DIP switches

Turn on the unit and open the inspection door as illustrated by the 
figure above. Operate the switches by using a resin ballpoint or 
another non-conducting object. Close the inspection door after the 
work is finished.

A

Inspection hole (upper left)

B

Inspection hole (upper right)

1

Inspection door (left)

2

Lift to open

3

Operation switch (S1S)

4

Electric component box cover

5

LED (H1P~H7P)

6

Push-button switch (BS1~BS5)

7

DIP switch (DS1,DS2)

8

Inspection door (right)

Making field settings

Settings are made on the master unit only. Do not make settings on 
the slave unit. Designate the outdoor unit closest to the branch section 
as master unit.
To make field settings:

1.

Turn off the operation switch of the master unit

2.

Turn off the power supply of the master and the slave unit.

3.

Set the target evaporating temperature with DS1.

4.

Designate the master unit with DS2.

5.

Turn on the power supply of the master and the slave unit.

6.

Check that LED H4P is lit. If so, the master unit has successfully 
been designated.

7.

Check that LED H5P is lit. If so, the multi-system has correctly 
been set. LED H5P lights up five seconds after turning on the 
power and stays lit.

ON
OFF
Blinking

Note

If the multi-system has correctly been set, LED H5P will light up 5 sec-
onds after turning on the power. If after this a transmission error 
occurs, H5P will not fade out. Instead, a malfunction code will be dis-
played.

Cylinder provided with siphon tube.

Other cylinders

Stand the cylinder upright and fill the refrigerant.
(There is a siphon tube inside, which makes it 
possible to replenish the refrigerant in the state of 
liquid without setting the cylinder upside down.)

Stand the cylinder upside down and fill the 
refrigerant.
(Pay attention so that the cylinder 
will not topple down.)

A little 
foam 
flows.

Foam always 
comes out.

Full of
liquid.

Sealing state

Refrigerant insufficiency

ON

REMOTE OFF

4

5

7

1

2

3

6

8

2

A

B

Target evaporating temperature (TEM)

Setting of master unit

Master unit

H1P

H2P

H3P

H4P

H5P

H6P

H7P

Slave unit

H1P

H2P

H3P

H4P

H5P

H6P

H7P

+10°C

position of 
the switches

–10°C

–15°C

–20°C

DS1

–5°C

(Factory Set)

0°C

–35°C

–25°C

+5°C

–45°C

–30°C

–40°C

DS1

DS1

ON

OFF

4

2

1

3

2

4

1

3

1

3

2

4

OFF

ON

ON

OFF

1

3

DS2

Master unit

Slave unit

(factory set)

2

3

4

1

2

4

DS2

Summary of Contents for LREQ15B7Y1R

Page 1: ...INSTALLATION MANUAL LREQ15B7Y1R LREQ20B7Y1R Air cooled refrigeration condensing unit...

Page 2: ...jennom positiv bed mmelse av B if lge Sertifikat C som det fremkommer i den Tekniske Konstruksjonsfilen D og gjennom positiv bed mmelse av E Anvendt modul F G Risikokategori H Se ogs neste side 13 jot...

Page 3: ...PS vastav k llastunud temperatuur M C Jahutusaine N Surve turvaseadme seadistus P bar Tootmisnumber ja tootmisaasta vaadake mudeli andmeplaati 21 PS K bar TS TSmin L C TSmax PS M C N P bar 22 Maksima...

Page 4: ...accordance with the instructions in this installation manual Improper installation may result in water leakage electric shocks or fire When installing the unit in a small room take measures so that t...

Page 5: ...containing less than 95 kg refrigerant charge CAUTION This unit is already filled with a certain amount of R410A Never open liquid and gas shutoff valve until the step specified in 9 CHECKS AFTER WOR...

Page 6: ...ber of indoor units be sure to install them at the same level Use either off cycle defrosting or electric heater defrosting as the defrosting type Hot gas defrosting models cannot be used Make sure th...

Page 7: ...for front side no higher than 1500 mm Wall height on the suction side no higher than 500 mm Wall height for sides no limit Make sure each unit is installed level Install the slave unit adjacent to the...

Page 8: ...See Engineering Data for details 5 If the outdoor units are installed in areas with heavy snowfall the installation of a snowbreak hood is required This is available as an optional accessory If the un...

Page 9: ...hen installing on a roof make sure the roof floor is strong enough and be sure to water proof all work Make sure the area around the machine drains properly by setting up drainage grooves around the f...

Page 10: ...used is clean and free of contaminants such as sulphur oxide dust chips oil and fat and water It is desirable that the maximum oil adhesion in the piping is 30 mg per 10 m Use the following type of re...

Page 11: ...f indoor units connected downstream Total capacity of indoor units after branching Liquid pipe size less than 4 0 kW 6 4 x 0 8 O type 4 0 kW over and less than 14 0 kW 9 5 x 0 8 O type 14 0 kW over an...

Page 12: ...plete Wait until all oil is dripped out 7 Cut the pinched piping off with a pipe cutter just above the brazing point or just above the marking in case there is no brazing point 8 Wait until all oil is...

Page 13: ...t to the valve cover mount and the screw thread of the service port Otherwise dew condensation water will intrude inside and freeze Therefore refrigerant gas leakage or a compressor malfunction may re...

Page 14: ...nnected at the lateral side bottom CAUTION Only use the dedictated outdoor unit multi connection piping kit EKHRQZM When brazing make sure there are no flammable materials around 1 Connect gas side ac...

Page 15: ...oisture Follow instructions in the dryer instruction manual concerning dryer brazing Repair any burning of dryer paint that occurs during dryer brazing Contact the manufacturer for more information ab...

Page 16: ...to install an earth leakage circuit breaker This unit uses an inverter so install the earth leakage circuit breaker that be capable of handling high harmonics in order to prevent malfunctioning of the...

Page 17: ...field supply 7 3 Procedure for power supply wiring Procedure for Power Supply Wiring 1 Power supply 3 phase 50 Hz 380 415 2 Overcurrent circuit breaker earth leakage circuit breaker all pole disconne...

Page 18: ...stem on page 13 by all means when connecting the operation output wiring A compressor failure may result if the operating output wiring is not connected Remote switch wiring connections When installin...

Page 19: ...ut operation output wiring from the front 10 When routing remote operating switch wiring from the front 11 Remote switch terminal block X3M 12 When routing remote switch wiring through a wiring openin...

Page 20: ...e the outdoor unit for one hour and then check that the reading on the vacuum gauge is not rising If the reading on the vacuum gauge is rising water may be remaining in the system or leakage may be oc...

Page 21: ...page 19 see the illustrations below Use the piping outlet for jobs required during the steps of 10 REFRIGERANT REPLENISHMENT on page 19 e g a job of taking in the charge hose Note After knocking out t...

Page 22: ...n operation d Turn off the operation switch of the outdoor unit after the speci fied amount of refrigerant is replenished To prevent liquid compression e Caution Fully open the shutoff valves on the g...

Page 23: ...in ballpoint or another non conducting object Close the inspection door after the work is finished A Inspection hole upper left B Inspection hole upper right 1 Inspection door left 2 Lift to open 3 Op...

Page 24: ...malfunction code items can be displayed on the condensing unit 1 Make sure that the LED H1P is off If the LED is on press the MODE button BS1 once 2 Press the MODE button BS1 once The LED H1P starts b...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...4P360438 1B 2014 01 Copyright 2013 Daikin 4P360438 1 B 0000000_...

Reviews: