1.

Directions to bring out the pipes

The local interunit piping can be connected either forward or to the 
sides (taken out through the bottom) as shown in the following 
figure.
When passing out through the bottom, use the knock hole in the 
bottom frame.

Precautions when knocking out knock holes

• Open knock hole in the base frame by drilling the 4 concave around 

it with a 6 mm bit.

• Be sure to avoid damaging the casing
• After knocking out the holes, we recommend you remove any burrs 

and paint them using the repair paint to prevent rusting.

• When passing electrical wiring through the knock holes, protect the 

wiring with a conduit or bushings, making sure not to damage the 
wiring.

2.

Removing Pinch Piping

WARNING

Never remove the pinched piping by brazing.
Failure to observe the instructions in procedure below properly may 
result in property damage or personal injury, which may be serious 
depending on the circumstances.

CAUTION

Use the following procedure to remove the pinched piping:
1

Remove the valve lid and make sure that the stop 
valves are fully closed.

2

Connect a charge hose to service ports of all stop valves.

3

Recover gas and oil from the pinched piping by using a recovery 
unit. 

4

When all gas and oil is recovered from the pinched piping, 
disconnect the charge hose and close the service ports.

5

In case the pinched piping lower part looks like detail

 in the 

figure below, follow instructions as per procedure steps 7+8.

In case the pinched piping lower part looks like detail

 in the 

figure below, follow instructions as per procedure steps 6+7+8.

6

Cut off the lower part of the smaller pinched piping with an 
appropriate tool (e.g. a pipe cutter, a pair of nippers, ...) so 
that a cross-section is open, allowing remaining oil to drip 
out in case the recovery was not complete.
Wait until all oil is dripped out.

7

Cut the pinched piping off with a pipe cutter just above the brazing 
point or just above the marking in case there is no brazing point. 

8

Wait until all oil is dripped out in case the recovery was not 
complete, and only then proceed with connection of the field 
piping.

1 Service port
2 Stop  valve
3 Point of pipe cutting just above brazing point or above marking
A Pinched piping 

B Pinched piping 

CAUTION

Precautions when connecting field piping.

• Perform brazing at the gas stop valve before brazing at the liquid 

stop valve.

• Add brazing material as shown in the figure.

CAUTION

• Be sure to use the supplied accessory pipes when carrying out 

piping work in the field.

• Be sure that the field installed piping does not touch other pipes, 

the bottom panel or side panel. Especially for the bottom and side 
connection, be sure to protect the piping with suitable insulation, to 
prevent it from coming into contact with the casing.

Operation Method of Shutoff Valves

Follow the instructions below when operating each shutoff valve.

CAUTION

• Do not open the shutoff valve until the steps specified in 

8-3 Checking of device and installation conditions

” is 

completed.
Do not leave the shutoff valve opened without turning the power 
on, otherwise refrigerant may be condensed in the compressor and 
the insulation of the main power supply circuit may be degraded.

• Be sure to use an exclusive tool to handle the shutoff valve. The 

shutoff valve is not of back sheet type. Excessive force imposed 
may break the valve.

• Use a charge hose when using the service port.
• Make sure that there is no refrigerant gas leakage after the valve 

cover and cap are securely tightened.

Tightening torque

Check with the following table the sizes of shutoff valves incorporated 
by each model and the tightening torque values of the respective 
shutoff valves.

CAUTION

Do not vent gases into the atmosphere.

Right-side connection

Front connection

Left-side connection

Knock hole

Concave section 
(4 places)

Drill

CAUTION

Never remove the pinched piping by brazing.

A B

2

1

1

3

2

Summary of Contents for LREQ15B7Y1R

Page 1: ...INSTALLATION MANUAL LREQ15B7Y1R LREQ20B7Y1R Air cooled refrigeration condensing unit...

Page 2: ...jennom positiv bed mmelse av B if lge Sertifikat C som det fremkommer i den Tekniske Konstruksjonsfilen D og gjennom positiv bed mmelse av E Anvendt modul F G Risikokategori H Se ogs neste side 13 jot...

Page 3: ...PS vastav k llastunud temperatuur M C Jahutusaine N Surve turvaseadme seadistus P bar Tootmisnumber ja tootmisaasta vaadake mudeli andmeplaati 21 PS K bar TS TSmin L C TSmax PS M C N P bar 22 Maksima...

Page 4: ...accordance with the instructions in this installation manual Improper installation may result in water leakage electric shocks or fire When installing the unit in a small room take measures so that t...

Page 5: ...containing less than 95 kg refrigerant charge CAUTION This unit is already filled with a certain amount of R410A Never open liquid and gas shutoff valve until the step specified in 9 CHECKS AFTER WOR...

Page 6: ...ber of indoor units be sure to install them at the same level Use either off cycle defrosting or electric heater defrosting as the defrosting type Hot gas defrosting models cannot be used Make sure th...

Page 7: ...for front side no higher than 1500 mm Wall height on the suction side no higher than 500 mm Wall height for sides no limit Make sure each unit is installed level Install the slave unit adjacent to the...

Page 8: ...See Engineering Data for details 5 If the outdoor units are installed in areas with heavy snowfall the installation of a snowbreak hood is required This is available as an optional accessory If the un...

Page 9: ...hen installing on a roof make sure the roof floor is strong enough and be sure to water proof all work Make sure the area around the machine drains properly by setting up drainage grooves around the f...

Page 10: ...used is clean and free of contaminants such as sulphur oxide dust chips oil and fat and water It is desirable that the maximum oil adhesion in the piping is 30 mg per 10 m Use the following type of re...

Page 11: ...f indoor units connected downstream Total capacity of indoor units after branching Liquid pipe size less than 4 0 kW 6 4 x 0 8 O type 4 0 kW over and less than 14 0 kW 9 5 x 0 8 O type 14 0 kW over an...

Page 12: ...plete Wait until all oil is dripped out 7 Cut the pinched piping off with a pipe cutter just above the brazing point or just above the marking in case there is no brazing point 8 Wait until all oil is...

Page 13: ...t to the valve cover mount and the screw thread of the service port Otherwise dew condensation water will intrude inside and freeze Therefore refrigerant gas leakage or a compressor malfunction may re...

Page 14: ...nnected at the lateral side bottom CAUTION Only use the dedictated outdoor unit multi connection piping kit EKHRQZM When brazing make sure there are no flammable materials around 1 Connect gas side ac...

Page 15: ...oisture Follow instructions in the dryer instruction manual concerning dryer brazing Repair any burning of dryer paint that occurs during dryer brazing Contact the manufacturer for more information ab...

Page 16: ...to install an earth leakage circuit breaker This unit uses an inverter so install the earth leakage circuit breaker that be capable of handling high harmonics in order to prevent malfunctioning of the...

Page 17: ...field supply 7 3 Procedure for power supply wiring Procedure for Power Supply Wiring 1 Power supply 3 phase 50 Hz 380 415 2 Overcurrent circuit breaker earth leakage circuit breaker all pole disconne...

Page 18: ...stem on page 13 by all means when connecting the operation output wiring A compressor failure may result if the operating output wiring is not connected Remote switch wiring connections When installin...

Page 19: ...ut operation output wiring from the front 10 When routing remote operating switch wiring from the front 11 Remote switch terminal block X3M 12 When routing remote switch wiring through a wiring openin...

Page 20: ...e the outdoor unit for one hour and then check that the reading on the vacuum gauge is not rising If the reading on the vacuum gauge is rising water may be remaining in the system or leakage may be oc...

Page 21: ...page 19 see the illustrations below Use the piping outlet for jobs required during the steps of 10 REFRIGERANT REPLENISHMENT on page 19 e g a job of taking in the charge hose Note After knocking out t...

Page 22: ...n operation d Turn off the operation switch of the outdoor unit after the speci fied amount of refrigerant is replenished To prevent liquid compression e Caution Fully open the shutoff valves on the g...

Page 23: ...in ballpoint or another non conducting object Close the inspection door after the work is finished A Inspection hole upper left B Inspection hole upper right 1 Inspection door left 2 Lift to open 3 Op...

Page 24: ...malfunction code items can be displayed on the condensing unit 1 Make sure that the LED H1P is off If the LED is on press the MODE button BS1 once 2 Press the MODE button BS1 once The LED H1P starts b...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...4P360438 1B 2014 01 Copyright 2013 Daikin 4P360438 1 B 0000000_...

Reviews: