![background image](http://html.mh-extra.com/html/daikin/fxza15a2veb/fxza15a2veb_installer-and-user-reference-manual_2460211047.webp)
14
|
About the box
Installer and user reference guide
47
FXZA15~50A2VEB
VRV system air conditioner
4P599623-1A – 2020.06
14 About the box
14.1 Overview: About the box
This chapter describes what you have to do after the box with the indoor unit is
delivered on-site.
It contains information about:
▪
Unpacking and handling the unit
▪
Removing the accessories from the unit
Keep the following in mind:
▪
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
▪
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
▪
Prepare the path along which you want to bring the unit inside in advance.
14.2 Indoor unit
14.2.1 To unpack and handle the unit
Use a sling of soft material or protective plates together with a rope when lifting
the unit. This to avoid damage or scratches to the unit.
1
Lift the unit by holding on to the hanger brackets without exerting any
pressure on other parts, especially on refrigerant piping, drain piping and
other resin parts.
1
2