![Daikin FTXZ09NV1S Service Manual Download Page 14](http://html1.mh-extra.com/html/daikin/ftxz09nv1s/ftxz09nv1s_service-manual_4706938014.webp)
Electrical Box / PCBs
Si041411E
12
Removal Procedure
12
Release the harness of
the indoor heat
exchanger thermistor
from the hook and draw
the electrical box a little.
13
Disconnect the
connector [S200].
[S200]: fan motor
14
Remove the electrical
box.
3. Remove the control PCB.
1
2
Remove the shield
plate.
Remove the screw and
remove the terminal
board.
The shield plate has 3
hooks.
Step
Procedure
Points
(R19844)
Hook
[S200]
(R19845)
(R19846)
Electrical box
Shield plate
Terminal board
(R20751)
Hook
Hook
(R20718)