![Daikin FTXTA30A2V1BW Installation Manual Download Page 6](http://html.mh-extra.com/html/daikin/ftxta30a2v1bw/ftxta30a2v1bw_installation-manual_2459541006.webp)
5 Installation
Installation manual
6
FTXTA30A2V1BW
Split system air conditioner
3P482320-9M – 2019.04
(mm)
44.5
605
17
110
798
150
155
44.5
Ø65
Ø65
d
g
g
a
e
d
a
f
f
b
c
a
a
a
a
a
a
h
± 610
± 605
± 555
k
j
i
a
Recommended mounting plate fixing spots
b
Pocket for the pipe port cover
c
Use tape measure as shown
d
Tabs for placing a spirit level
e
Unit center
f
Hole for embedded piping Ø65 mm
g
Value for tape measure
h
Position the end of tape measure at symbol " "
i
Drain hose
j
Liquid pipe
k
Gas pipe
5.2.2
To drill a wall hole
CAUTION
For walls containing a metal frame or a metal board, use a
wall embedded pipe and wall cover in the feed-through
hole to prevent possible heat, electrical shock, or fire.
NOTICE
Be sure to seal the gaps around the pipes with sealing
material (field supply), in order to prevent water leakage.
1
Bore a 65 mm large feed-through hole in the wall with a
downward slope towards the outside.
2
Insert a wall embedded pipe into the hole.
3
Insert a wall cover into the wall pipe.
Ø65
a b
c
a
Wall embedded pipe
b
Putty
c
Wall hole cover
4
After completing wiring, refrigerant piping and drain piping, do
NOT forget to seal the gap with putty.
5.2.3
To remove the pipe port cover
To connect the piping on right-side, right-bottom, left-side or left-
bottom, the pipe port cover MUST be removed.
1
Cut off the pipe port cover from inside the front grille using a
coping saw.
2
Remove any burrs along the cut section using a half round
needle file.
NOTICE
Do NOT use nippers to remove the pipe port cover, as this
would damage the front grille.
5.2.4
To provide drainage
Make sure condensation water can be evacuated properly. This
involves:
▪ General guidelines
▪ Connecting the drain piping to the indoor unit
▪ Checking for water leaks