![background image](http://html1.mh-extra.com/html/daikin/ftks09sl216/ftks09sl216_service-manual_2459357076.webp)
73
Installation and Maintenance
Service Manual
Remove the 2 screws fixing the cover of elec-
tric box. Lift to remove the cover. Loosen the
wire and disconnect the terminal. Lift to re-
move the electric box assy.
6.Remove electric box assy
Electric box assy
Unscrew the fastening nut of the 4-way Valve
Assy coil and remove the coil. Wrap the 4-
way Valve Assy with wet cotton and unsolder
the 4 weld spots connecting the 4-way Valve
Assy to take it out.(Note: Refrigerant should
be discharged firstly.) Welding process
should be as quickly as possible and keep
wrapping cotton wet all the time. Be sure not
to burn out the lead-out wire of compressor.
7.Remove 4-way valve assy
8.Remove
Electric Expansion Valve Sub-Assy
Unsolder weld point of
Electric Expansion
Valve Sub-Assy,valve and outlet pipe of
condensator. Then remove the Electric
Expansion Valve Sub-Assy. Do not block the
Electric Expansion Valve when unsoldering it.
(Note: before unsoldering,discharge
refrigerants completely)
4-way Valve Assy
Electric Expansion Valve Sub-Assy
Summary of Contents for FTKS09SL216
Page 23: ...20 Technical Information Service Manual ...
Page 84: ...JF00303648 ...