![background image](http://html1.mh-extra.com/html/daikin/ftks09hv2s/ftks09hv2s_service-manual_3397922017.webp)
Si041137
Removal of PCBs (Pattern 1)
Removal Procedure
15
2. Remove the terminal
board.
1
Remove the screw and
remove the terminal
board.
3. Remove the signal
receiver unit.
1
Unfasten the 3 hooks.
2
Unfasten the hook on
the opposite side, and
lift up the signal
receiver unit.
Step
Procedure
Points
(R10315)
Terminal board
(R12277)
Signal receiver unit
(R8262)