background image

Installation manual

4

EWLP012~065KBW1N

Condenserless water-cooled water chillers

4PW61665-1 – 07.2010

When connecting the flare nut, coat the flare inner surface with
ether oil or ester oil and initially tighten 3 or 4 turns by hand
before tightening firmly.

Check the pipe connector for gas leaks.

The discharge and liquid line are to be connected with flare
connections to the remote condenser piping. For use of the
correct pipe diameter see 

"Technical specifications" on page 1

.

piping length: equivalent 

= 50 m

maximum height  = 30 m

Leak test and vacuum drying

The units were checked for leaks by the manufacturer.

After connection of the piping, a leak test must be performed and the
air in the refrigerant piping must be evacuated to a value of 4 mbars
absolute by means of a vacuum pump.

Open the discharge- and liquid stop valves.

1

to open

-

Remove the cap (1) and turn the shaft (2) counterclockwise 
with hexagon socket screw keys (3) (JIS B 4648 nominal size 
4 mm).

-

Turn it all the way until the shaft stops.

-

Tighten the cap firmly.

2

to close

-

Remove the cap and turn the shaft clockwise.

-

Tighten the shaft firmly until it reaches the sealed area (4) of 
the body.

-

Tighten the cap firmly. 

Charging the unit

First perform a rough refrigerant charge according to the table:

VRC = volume of remote condenser (l)
LLP = length of liquid pipe (m)

Next perform a fine-tuning

For fine-tuning of the refrigerant charge, the compressor must
operate.

If the liquid-line sightglass is showing seal after the rough
charging (due to possible different conditions), add 10%
refrigerant charge weight.

If the liquid-line sightglass is showing some gas-bubbles, the
rough refrigerant charge is sufficient by fine-tuning the additional
10% refrigerant charge weight.

If the liquid-line sightglass is showing flash gas, then charge
until one of the previous situations occur. Then fine-tune with the
additional 10% refrigerant charge weight. The unit must have the
time to stabelize which means that this charging has to be done
in a smooth way.

When inserting the refrigerant piping in the wall hole, take
care not to let dust or moisture come into the piping.
Protect the pipes with a cap or seal the pipe end
completely with tape.

Make sure the pipes are filled with N

2

  during welding in

order to protect the pipes against soot.

There should be no blockage (stopvalve, solenoid valve)
between the remote condenser and the provided liquid
injection of the compressor.

NOTE

Use a charging hose with push rod when using
the service port (5).

Check for refrigerant gas leakage after tightening
the cap.

Make sure to keep stop valve open during
operation.

Do not purge the air with refrigerants. Use a vacuum pump
to vacuum the installation.

refrigerant charge (kg)

EWLP012

0.9+(0.(VRCx0.38)

EWLP020

1.5+(0.(VRCx0.38)

EWLP026

1.7+(0.(VRCx0.38)

EWLP030

2.0+(0.(VRCx0.38)

EWLP040

2x[1.5+(0.(VRCx0.38)]

EWLP055

2x[1.7+(0.(VRCx0.38)]

EWLP065

2x[2.0+(0.(VRCx0.38)]

NOTE

Take  care for contamination of the remote condenser
in order to avoid blocking of the system. It is impossible
for Daikin to control the contamination of the "foreign"
condenser of the installer. The Daikin unit  has a strict
contamination level.

Use the liquid line check valve for charging refrigerant and
make sure to charge liquid.

5

1

2

3

4

4PW61665-1_digital_EN.book  Page 4  Friday, August 27, 2010  2:13 PM

Summary of Contents for EWLP020KBW1N

Page 1: ...TION MANUAL EWLP012KBW1N EWLP020KBW1N EWLP026KBW1N EWLP030KBW1N EWLP040KBW1N EWLP055KBW1N EWLP065KBW1N Condenserless water cooled water chillers 4PW61665 1_digital_EN book Page 1 Friday August 27 2010...

Page 2: ...arecer positivo de B de acordo com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifikat C 11 Information enligt A och godk nts av B enligt Certifikatet...

Page 3: ...WLP units Technical specifications 1 Electrical specifications 1 Options and features 1 Options Glycol application for chilled water temperature down to 10 C or 5 C BMS connection MODBUS optional kit...

Page 4: ...ut of the unit The equipment is not intended for use in a potentially explosive atmosphere INSPECTING AND HANDLING THE UNIT At delivery the unit should be checked and any damage should be reported imm...

Page 5: ...nd to prevent foreign materials e g mineral oils such as SUNISO and moisture from mixing into the system Vacuum pump use a 2 stage vacuum pump with a non return valve Make sure the pump oil does not f...

Page 6: ...iquid line sightglass is showing some gas bubbles the rough refrigerant charge is sufficient by fine tuning the additional 10 refrigerant charge weight If the liquid line sightglass is showing flash g...

Page 7: ...ular base WATER QUALITY SPECIFICATIONS A corrosion B scale CONNECTING THE WATER CIRCUIT The evaporator is provided with GAS female pipe thread connections for the water inlet and outlet refer to the o...

Page 8: ...uit and cable requirements 1 The electrical power supply to the unit must be arranged so that it can be switched on or off independently of the electrical supply to other items of the plant and equipm...

Page 9: ...040 0 22 EWLP055 0 21 EWLP065 0 20 2 European International Technical Standard setting the limits for harmonic currents produced by equipment connected to public low voltage systems with input current...

Page 10: ...Installation manual 8 EWLP012 065KBW1N Condenserless water cooled water chillers 4PW61665 1 07 2010 NOTES 4PW61665 1_digital_EN book Page 8 Friday August 27 2010 2 13 PM...

Page 11: ...water chiller is then controlled by the Digital Display Controller Shut down by switching off the controller and the circuit breaker of the power circuit WARNINGS Emergency shut down Switch off the ci...

Page 12: ...4PW61665 1 07 2010 Copyright 2010 Daikin 4PW61665 1_digital_EN book Page 1 Friday August 27 2010 2 13 PM...

Reviews: