14
|
Maintenance and service
Installer reference guide
267
ERRA08~12E + ELVH/23E
Daikin Altherma 3 R MT F
4P708474-1 – 2023.05
14 Maintenance and service
NOTICE
General maintenance/inspection checklist.
Next to the maintenance instructions in
this chapter, a general maintenance/inspection checklist is also available on the
Daikin Business Portal (authentication required).
The general maintenance/inspection checklist is complementary to the instructions
in this chapter and can be used as a guideline and reporting template during
maintenance.
NOTICE
Maintenance MUST be done by an authorised installer or service agent.
We recommend performing maintenance at least once a year. However, applicable
legislation might require shorter maintenance intervals.
NOTICE
Applicable legislation on
fluorinated greenhouse gases
requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes:
GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
In this chapter
14.1 Maintenance safety precautions
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
NOTICE: Risk of electrostatic discharge
Before performing any maintenance or service work, touch a metal part of the unit in
order to eliminate static electricity and to protect the PCB.